UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-Q
(Mark One)
 
[X]
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the Quarterly Period Ended June 30, 2013
Or
 
[   ]
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from                      to                     .
(Exact name of registrant as specified in its charter)
Delaware
 
1-16811
 
25-1897152
(State or other
jurisdiction of
incorporation)
 
(Commission
File Number)
 
(IRS Employer
Identification No.)
600 Grant Street, Pittsburgh, PA
 
15219-2800
(Address of principal executive offices)
 
(Zip Code)
(412) 433-1121
(Registrant’s telephone number,
including area code)
 
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes P  No    
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes [ P ] No [    ]
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definition of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act. (Check one):
 
Large accelerated filer  P 
 
Accelerated filer     
 
Non-accelerated filer     
  
Smaller reporting company     
 
 
 
 
(Do not check if a smaller reporting company)
  
 
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act).
Yes     No P 
Common stock outstanding at July 25, 2013 – 144,657,396 shares




INDEX

 
Page
PART I – FINANCIAL INFORMATION
 
 
Item 1.
Financial Statements:
 
 
 
 
 
 
 
 
 
 
 
 
Item 2.
 
Item 3.
 
Item 4.
 
 
 
 
Item 1.
 
Item 4.
 
Item 6.






UNITED STATES STEEL CORPORATION
CONSOLIDATED STATEMENT OF OPERATIONS
(Unaudited)

 
 
Three Months Ended 
 June 30,
 
Six Months Ended 
 June 30,
(Dollars in millions, except per share amounts)
 
2013
 
2012
 
2013
 
2012
Net sales:
 
 
 
 
 
 
 
 
Net sales
 
$
4,119

 
$
4,695

 
$
8,436

 
$
9,528

Net sales to related parties (Note 19)
 
310

 
322

 
588

 
661

Total
 
4,429

 
5,017

 
9,024

 
10,189

Operating expenses (income):
 
 
 
 
 
 
 
 
Cost of sales (excludes items shown below)
 
4,114

 
4,485

 
8,356

 
9,118

Selling, general and administrative expenses
 
151

 
165

 
296

 
331

Depreciation, depletion and amortization
 
170

 
164

 
341

 
327

Loss (income) from investees
 
3

 
(44
)
 
(5
)
 
(68
)
Net (gain) loss on disposal of assets (Note 4)
 
(1
)
 

 

 
309

Other (income) expense, net
 
(1
)
 
(6
)
 
5

 
(8
)
Total
 
4,436

 
4,764

 
8,993

 
10,009

(Loss) income from operations
 
(7
)
 
253

 
31

 
180

Interest expense
 
58

 
66

 
143

 
115

Interest income
 
(1
)
 
(1
)
 
(2
)
 
(5
)
Other financial costs
 
11

 
17

 
31

 
22

Net interest and other financial costs (Note 7)
 
68

 
82

 
172

 
132

(Loss) income before income taxes and noncontrolling interests
 
(75
)
 
171

 
(141
)
 
48

Income tax provision (Note 9)
 
3

 
70

 
10

 
166

Net (loss) income
 
(78
)
 
101

 
(151
)
 
(118
)
Less: Net income attributable to noncontrolling interests
 

 

 

 

Net (loss) income attributable to United States Steel Corporation
 
$
(78
)
 
$
101

 
$
(151
)
 
$
(118
)
Earnings per common share (Note 11):
 
 
 
 
 
 
 
 
Earnings per share attributable to United States Steel Corporation shareholders:
 
 
 
 
 
 
 
 
-Basic
 
$
(0.54
)
 
$
0.70

 
$
(1.05
)
 
$
(0.82
)
-Diluted
 
$
(0.54
)
 
$
0.62

 
$
(1.05
)
 
$
(0.82
)












The accompanying notes are an integral part of these consolidated financial statements.

-1-



UNITED STATES STEEL CORPORATION
CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME (LOSS)
(Unaudited)

 
 
Three Months Ended 
 June 30,
 
Six Months Ended 
 June 30,
(Dollars in millions)
 
2013
 
2012
 
2013
 
2012
Net (loss) income
 
$
(78
)
 
$
101

 
$
(151
)
 
$
(118
)
Other comprehensive income (loss), net of tax:
 
 
 
 
 
 
 
 
Changes in foreign currency translation adjustments
 
19

 
(91
)
 
(18
)
 
16

Changes in pension and other employee benefit accounts
 
69

 
66

 
138

 
136

Total other comprehensive income (loss), net of tax
 
88

 
(25
)
 
120

 
152

Comprehensive income (loss) including noncontrolling interest
 
10

 
76

 
(31
)
 
34

Comprehensive loss attributable to noncontrolling interest
 

 

 

 

Comprehensive income (loss) attributable to United States Steel Corporation
 
$
10

 
$
76

 
$
(31
)
 
$
34





































The accompanying notes are an integral part of these consolidated financial statements.

-2-



UNITED STATES STEEL CORPORATION
CONSOLIDATED BALANCE SHEET

(Dollars in millions)
 
(Unaudited) 
 June 30, 
 2013
 
December 31,  
 2012
Assets
 
 
 
 
Current assets:
 
 
 
 
Cash and cash equivalents
 
$
767

 
$
570

Receivables, less allowance of $54 and $55
 
1,971

 
1,872

Receivables from related parties (Note 19)
 
171

 
218

Inventories (Note 12)
 
2,269

 
2,503

Deferred income tax benefits (Note 9)
 
167

 
171

Other current assets
 
71

 
40

Total current assets
 
5,416

 
5,374

Property, plant and equipment
 
16,902

 
16,906

Less accumulated depreciation and depletion
 
10,746

 
10,498

Total property, plant and equipment, net
 
6,156

 
6,408

Investments and long-term receivables, less allowance of $3 in both periods
 
621

 
609

Intangibles – net (Note 5)
 
277

 
253

Goodwill (Note 5)
 
1,790

 
1,822

Deferred income tax benefits (Note 9)
 
306

 
424

Other noncurrent assets
 
298

 
327

Total assets
 
$
14,864

 
$
15,217

Liabilities
 
 
 
 
Current liabilities:
 
 
 
 
Accounts payable and other accrued liabilities
 
$
1,650

 
$
1,722

Accounts payable to related parties (Note 19)
 
93

 
78

Bank checks outstanding
 
47

 
15

Payroll and benefits payable
 
950

 
977

Accrued taxes
 
151

 
146

Accrued interest
 
55

 
50

Short-term debt and current maturities of long-term debt (Note 14)
 
322

 
2

Total current liabilities
 
3,268

 
2,990

Long-term debt, less unamortized discount (Note 14)
 
3,611

 
3,936

Employee benefits
 
4,122

 
4,416

Deferred credits and other noncurrent liabilities
 
389

 
397

Total liabilities
 
11,390

 
11,739

Contingencies and commitments (Note 20)
 

 

Stockholders’ Equity (Note 17):
 
 
 
 
Common stock (150,925,911 shares issued) (Note 11)
 
151

 
151

Treasury stock, at cost (6,276,682 and 6,643,553 shares)
 
(482
)
 
(521
)
Additional paid-in capital
 
3,656

 
3,652

Retained earnings
 
3,296

 
3,463

Accumulated other comprehensive loss (Note 18)
 
(3,148
)
 
(3,268
)
Total United States Steel Corporation stockholders’ equity
 
3,473

 
3,477

Noncontrolling interests
 
1

 
1

Total liabilities and stockholders’ equity
 
$
14,864

 
$
15,217



The accompanying notes are an integral part of these consolidated financial statements.

-3-



UNITED STATES STEEL CORPORATION
CONSOLIDATED STATEMENT OF CASH FLOWS
(Unaudited)

 
 
Six Months Ended 
 June 30,
(Dollars in millions)
 
2013
 
2012
Increase (decrease) in cash and cash equivalents
 
 
 
 
Operating activities:
 
 
 
 
Net loss
 
$
(151
)
 
$
(118
)
Adjustments to reconcile to net cash provided by operating activities:
 
 
 
 
Depreciation, depletion and amortization
 
341

 
327

Provision for doubtful accounts
 
(1
)
 
(3
)
Pensions and other postretirement benefits
 
10

 
(111
)
Deferred income taxes
 
(2
)
 
107

Net loss on disposal of assets (Note 4)
 

 
309

Currency remeasurement loss
 
21

 
6

Distributions received, net of equity investees income
 
4

 
(7
)
Changes in:
 
 
 
 
Current receivables
 
(64
)
 
(159
)
Inventories
 
204

 
252

Current accounts payable and accrued expenses
 
(10
)
 
158

Income taxes receivable/payable
 
(3
)
 
22

Bank checks outstanding
 
32

 
31

All other, net
 
3

 
47

Net cash provided by operating activities
 
384

 
861

Investing activities:
 
 
 
 
Capital expenditures
 
(221
)
 
(397
)
Acquisition of intangible assets (Note 5)
 
(12
)
 

Disposal of assets
 
1

 
133

Change in restricted cash, net
 
34

 
10

Investments, net
 
(6
)
 
(1
)
Net cash used in investing activities
 
(204
)
 
(255
)
Financing activities:
 
 
 
 
Revolving credit facilities – borrowings
 

 
523

– repayments
 

 
(653
)
Receivables Purchase Agreement payments
 

 
(380
)
Issuance of long-term debt, net of financing costs
 
576

 
392

Repayment of long-term debt
 
(542
)
 
(315
)
Dividends paid
 
(14
)
 
(14
)
Net cash provided by (used in) financing activities
 
20

 
(447
)
Effect of exchange rate changes on cash
 
(3
)
 
(2
)
Net increase in cash and cash equivalents
 
197

 
157

Cash and cash equivalents at beginning of year
 
570

 
408

Cash and cash equivalents at end of period
 
$
767

 
$
565



The accompanying notes are an integral part of these consolidated financial statements.

-4-



Notes to Consolidated Financial Statements (Unaudited)
1.    Basis of Presentation
United States Steel Corporation (U. S. Steel) produces and sells steel mill products, including flat-rolled and tubular products, in North America and Central Europe. Operations in North America also include transportation services (railroad and barge operations) and real estate operations.
The year-end consolidated balance sheet data was derived from audited statements but does not include all disclosures required for complete financial statements by accounting principles generally accepted in the United States of America (U.S. GAAP). The other information in these financial statements is unaudited but, in the opinion of management, reflects all adjustments necessary for a fair presentation of the results for the periods covered. All such adjustments are of a normal recurring nature unless disclosed otherwise. These financial statements, including notes, have been prepared in accordance with the applicable rules of the Securities and Exchange Commission and do not include all of the information and disclosures required by accounting principles generally accepted in the United States of America for complete financial statements. Additional information is contained in the United States Steel Corporation Annual Report on Form 10-K for the year ended December 31, 2012 which should be read in conjunction with these financial statements.
Reclassifications
Certain reclassifications of prior years’ data have been made to conform to the current year presentation.
2.    New Accounting Standards
On February 5, 2013, the FASB issued Accounting Standards Update No. 2013-02, Reporting of Amounts Reclassified Out of Accumulated Other Comprehensive Income (ASU 2013-02). ASU 2013-02 requires companies to present information about reclassification adjustments from accumulated other comprehensive income, including the amount of the reclassification and the income statement line items affected by the reclassification. The information must be presented in the financial statements in a single note or on the face of the financial statements. ASU 2013-02 is effective for interim and annual periods beginning after December 15, 2012. U. S. Steel adopted ASU 2013-02 effective January 1, 2013 and has provided the required disclosures in Note 18.
On July 18, 2013, the FASB issued Accounting Standards Update No. 2013-11, Presentation of an Unrecognized Tax Benefit When a Net Operating Loss Carryforward, a Similar Tax Loss, or a Tax Credit Carryforward Exists (ASU 2013-11). ASU 2013-11 requires the netting of unrecognized tax benefits (UTBs) against a deferred tax asset for a loss or other carryforward that would apply in settlement of the uncertain tax positions. UTBs are required to be netted against all available same-jurisdiction loss or other tax carryforwards that would be utilized, rather than only against carryforwards that are created by the UTBs. ASU 2013-11 is effective for interim and annual periods beginning after December 15, 2013. U. S. Steel early adopted ASU 2013-11 in the second quarter of 2013 on a prospective basis which resulted in a reduction of approximately $35 million in the presentation of our noncurrent deferred tax assets and unrecognized tax benefits (within deferred credits and other noncurrent liabilities).
3.    Segment Information
U. S. Steel has three reportable segments: Flat-rolled Products (Flat-rolled), U. S. Steel Europe (USSE), and Tubular Products (Tubular). The results of several other operating segments that do not constitute reportable segments are combined and disclosed in the Other Businesses category. Prior to January 31, 2012, our USSE reportable segment consisted of U. S. Steel Košice (USSK) and U. S. Steel Serbia (USSS). On January 31, 2012, U. S. Steel sold USSS (see Note 4). The USSE segment information subsequent to January 31, 2012 reflects the results of USSK only.
The chief operating decision maker evaluates performance and determines resource allocations based on a number of factors, the primary measure being income (loss) from operations. Income (loss) from operations for reportable segments and Other Businesses does not include net interest and other financial costs (income), income taxes, postretirement benefit expenses (other than service cost and amortization of prior service cost for active employees) and certain other items that management believes are not indicative of future results. Information on segment assets is not disclosed, as it is not reviewed by the chief operating decision maker.
The accounting principles applied at the operating segment level in determining income (loss) from operations are generally the same as those applied at the consolidated financial statement level. The transfer value for

-5-



steel rounds from Flat-rolled to Tubular is based on cost. All other intersegment sales and transfers are accounted for at market-based prices and are eliminated at the corporate consolidation level. Corporate-level selling, general and administrative expenses and costs related to certain former businesses are allocated to the reportable segments and Other Businesses based on measures of activity that management believes are reasonable.
The results of segment operations for the three months ended June 30, 2013 and 2012 are:
(In millions)                                            Second Quarter 2013
 
Customer
Sales
 
Intersegment
Sales
 
Net
Sales
 
Income
(loss)
from
investees
 
Income
(loss)
from
operations
Flat-rolled
 
$
2,876

 
$
326

 
$
3,202

 
$
3

 
$
(51
)
USSE
 
778

 
1

 
779

 

 
10

Tubular
 
709

 
1

 
710

 
(5
)
 
45

Total reportable segments
 
4,363

 
328

 
4,691

 
(2
)
 
4

Other Businesses
 
66

 
35

 
101

 
(1
)
 
43

Reconciling Items and Eliminations
 

 
(363
)
 
(363
)
 

 
(54
)
Total
 
$
4,429

 
$

 
$
4,429

 
$
(3
)
 
$
(7
)

 
 
 
 
 
 
 
 
 
 
Second Quarter 2012
 

 

 

 

 

Flat-rolled
 
$
3,356

 
$
539

 
$
3,895

 
$
45

 
$
177

USSE
 
763

 
26

 
789

 

 
34

Tubular
 
871

 
2

 
873

 

 
103

Total reportable segments
 
4,990

 
567

 
5,557

 
45

 
314

Other Businesses
 
27

 
36

 
63

 
(1
)
 
16

Reconciling Items and Eliminations
 

 
(603
)
 
(603
)
 

 
(77
)
Total
 
$
5,017

 
$

 
$
5,017

 
$
44

 
$
253

The results of segment operations for the six months ended June 30, 2013 and 2012 are:
(In millions)                                         First Six Months 2013
 
Customer
Sales
 
Intersegment
Sales
 
Net
Sales
 
Income
(loss)
from
investees
 
Income
(loss)
from
operations
Flat-rolled
 
$
5,979

 
$
661

 
$
6,640

 
$
13

 
$
(64
)
USSE
 
1,561

 
2

 
1,563

 

 
48

Tubular
 
1,395

 
2

 
1,397

 
(6
)
 
109

Total reportable segments
 
8,935

 
665

 
9,600

 
7

 
93

Other Businesses
 
89

 
69

 
158

 
(2
)
 
48

Reconciling Items and Eliminations
 

 
(734
)
 
(734
)
 

 
(110
)
Total
 
$
9,024

 
$

 
$
9,024

 
$
5

 
$
31


 
 
 
 
 
 
 
 
 
 
First Six Months 2012
 

 

 

 

 

Flat-rolled
 
$
6,656

 
$
990

 
$
7,646

 
$
73

 
$
360

USSE
 
1,578

 
75

 
1,653

 

 

Tubular
 
1,817

 
3

 
1,820

 
(3
)
 
232

Total reportable segments
 
10,051

 
1,068

 
11,119

 
70

 
592

Other Businesses
 
138

 
92

 
230

 
(2
)
 
33

Reconciling Items and Eliminations
 

 
(1,160
)
 
(1,160
)
 

 
(445
)
Total
 
$
10,189

 
$

 
$
10,189

 
$
68

 
$
180


-6-



The following is a schedule of reconciling items to income (loss) from operations:
 
 
Three Months Ended June 30,
 
Six Months Ended June 30,
(In millions)
 
2013
 
2012
 
2013
 
2012
Items not allocated to segments:
 

 

 

 

Postretirement benefit expense (a)
 
$
(54
)
 
$
(77
)
 
$
(110
)
 
$
(154
)
Other items not allocated to segments:
 

 

 

 

Net loss on the sale of assets (Note 4)
 
$

 
$

 
$

 
$
(310
)
Property tax settlements
 

 

 

 
19

Total other items not allocated to segments
 

 

 

 
(291
)
Total reconciling items
 
$
(54
)
 
$
(77
)
 
$
(110
)
 
$
(445
)
(a) Consists of the net periodic benefit cost elements, other than service cost and amortization of prior service cost for active employees, associated with our pension, retiree health care and life insurance benefit plans.
4.    Dispositions
The net loss on disposal of assets for the first six months of 2012 primarily relates to the following dispositions:
U. S. Steel Serbia
On January 31, 2012, U. S. Steel sold USSS to the Republic of Serbia for a purchase price of one dollar. In addition, USSK received a $40 million payment for certain intercompany balances owed by USSS for raw materials and support services. As a result of this transaction, U. S. Steel recorded a total non-cash pretax charge of $399 million.
Birmingham Southern Railroad Company
On February 1, 2012, U. S. Steel completed the sale of the majority of the operating assets of Birmingham Southern Railroad Company and the Port Birmingham Terminal. As a result of the transaction, U. S. Steel recorded a pretax gain of $89 million.
5.     Goodwill and Intangible Assets
The changes in the carrying amount of goodwill by segment for the six months ended June 30, 2013 are as follows:
 
 
Flat-rolled
Segment
 
USSE
Segment
 
Tubular
Segment
 
Total
Balance at December 31, 2012
 
$
984

 
$
4

 
$
834

 
$
1,822

Goodwill from acquisitions
 

 

 
3

 
$
3

Currency translation
 
(35
)
 

 

 
(35
)
Balance at June 30, 2013
 
$
949

 
$
4

 
$
837

 
$
1,790

Goodwill represents the excess of the cost over the fair value of acquired identifiable tangible and intangible assets and liabilities assumed from businesses acquired. We have two reporting units that include nearly all of our goodwill: our Flat-rolled reporting unit and our Texas Operations reporting unit, which is part of our Tubular operating segment.
Goodwill is tested for impairment at the reporting unit level annually in the third quarter and whenever events or circumstances indicate that the carrying value may not be recoverable. U. S. Steel completed its annual goodwill impairment evaluation, by performing a qualitative assessment, during the third quarter of 2012 and determined, on the basis of a number of economic, cost, market and other qualitative factors, that there was no indication of goodwill impairment for any of the reporting units. Goodwill impairment tests in prior years also indicated that goodwill was not impaired for any reporting unit.

-7-



Amortizable intangible assets are being amortized on a straight-line basis over their estimated useful lives and are detailed below:
 
 

 
As of June 30, 2013
 
As of December 31, 2012
(In millions)
 
Useful
Lives
 
Gross
Carrying
Amount
 
Accumulated
Amortization
 
Net
Amount
 
Gross
Carrying
Amount
 
Accumulated
Amortization
 
Net
Amount
Customer relationships
 
22-23 Years
 
$
216

 
$
58

 
$
158

 
$
221

 
$
54

 
$
167

Other
 
2-20 Years
 
23

 
12

 
11

 
22

 
11

 
11

Total amortizable intangible assets
 

 
$
239

 
$
70

 
$
169

 
$
243

 
$
65

 
$
178

The carrying amount of acquired water rights with indefinite lives as of June 30, 2013 and December 31, 2012 totaled $75 million. The water rights are tested for impairment annually in the third quarter. U. S. Steel completed its annual evaluation during the third quarter of 2012 by performing a qualitative assessment which indicated that the water rights were not impaired. Prior year impairment tests also indicated that the water rights were not impaired.
During the second quarter of 2013, U. S. Steel acquired indefinite-lived intangible assets for $12 million and entered into an agreement to make future payments contingent upon certain factors. As of June 30, 2013, U. S. Steel recorded a liability of $24 million to reflect the fair value of the contingent consideration. The aggregate purchase price was $36 million, and U. S. Steel allocated $33 million to indefinite-lived intangible assets, based upon their estimated fair value, and the remaining $3 million to goodwill. The liability for contingent consideration will be reassessed each quarter. The maximum potential liability for contingent consideration is $53 million.
Amortization expense was $2 million in both the three months ended June 30, 2013 and 2012 and was $5 million in both the six months ended June 30, 2013 and 2012. The estimated future amortization expense of identifiable intangible assets during the next five years is $6 million for the remaining portion of 2013 and $11 million each year from 2014 to 2017.

-8-



6.    Pensions and Other Benefits
The following table reflects the components of net periodic benefit cost for the three months ended June 30, 2013 and 2012:
 
 
Pension
Benefits
 
Other
Benefits
(In millions)
 
2013
 
2012
 
2013
 
2012
Service cost
 
$
32

 
$
30

 
$
7

 
$
8

Interest cost
 
102

 
117

 
36

 
46

Expected return on plan assets
 
(153
)
 
(153
)
 
(32
)
 
(29
)
Amortization of prior service cost
 
6

 
4

 
(4
)
 
5

Amortization of actuarial net loss
 
91

 
88

 
7

 

Net periodic benefit cost, excluding below
 
78

 
86

 
14

 
30

Multiemployer plans
 
18

 
17

 

 

Net periodic benefit cost
 
$
96

 
$
103

 
$
14

 
$
30

The following table reflects the components of net periodic benefit cost for the six months ended June 30, 2013 and 2012:
 
 
Pension
Benefits
 
Other
Benefits
(In millions)
 
2013
 
2012
 
2013
 
2012
Service cost
 
$
64

 
$
59

 
$
14

 
$
15

Interest cost
 
203

 
233

 
71

 
91

Expected return on plan assets
 
(307
)
 
(306
)
 
(65
)
 
(57
)
Amortization of prior service cost
 
12

 
9

 
(7
)
 
11

Amortization of actuarial net loss
 
183

 
176

 
15

 

Net periodic benefit cost, excluding below
 
155

 
171

 
28

 
60

Multiemployer plans
 
36

 
34

 

 

Settlement, termination and curtailment gains
 

 
(2
)
 

 

Net periodic benefit cost
 
$
191

 
$
203

 
$
28

 
$
60

Employer Contributions
During the first six months of 2013, U. S. Steel made $45 million in required cash contributions to the USSC pension plans, cash payments of $36 million to the Steelworkers’ Pension Trust and $4 million of pension payments not funded by trusts.
During the first six months of 2013, cash payments of $113 million were made for other postretirement benefit payments not funded by trusts. In addition, U. S. Steel made a required contribution of $10 million in the first six months of 2013 to our trust for represented retiree health care and life insurance benefits.
Company contributions to defined contribution plans totaled $11 million in both the three months ended June 30, 2013 and 2012. Company contributions to defined contribution plans totaled $22 million and $21 million for the six months ended June 30, 2013 and 2012, respectively.
            
Pension Funding
In January 2013, U. S. Steel's Board of Directors authorized voluntary contributions to U. S. Steel's trusts for pensions and other benefits of up to $300 million through the end of 2014. U. S. Steel made voluntary contributions to our main U.S. defined benefit plan of $140 million in 2012. U. S. Steel will likely make voluntary contributions of similar amounts in future periods in order to mitigate potentially larger mandatory contributions in later years. Assuming future asset performance consistent with our expected long-term earnings rate assumption of 7.75%, we anticipate that the interest rate formula changes in the pension stabilization legislation enacted in 2012 will allow us to continue to make voluntary contributions of approximately $140 million per year

-9-



through 2015 before we could be required to contribute more than that amount should the current low interest rate environment continue.
7.    Net Interest and Other Financial Costs
Net interest and other financial costs includes interest expense, interest income, financing costs, derivatives gains and losses and foreign currency remeasurement gains and losses. Foreign currency gains and losses are a result of foreign currency denominated assets and liabilities that require remeasurement. During the three months ended June 30, 2013 and 2012, net foreign currency remeasurement losses of $3 million and $10 million, respectively, were recorded in other financial costs. During the six months ended June 30, 2013 and 2012, net foreign currency remeasurement losses of $12 million and $8 million, respectively, were recorded in other financial costs.
For the six months ended June 30, 2013, net interest and other financial costs also includes a charge of $34 million related to repurchases of approximately $542 million aggregate principal amount of our 4.00% Senior Convertible Notes due May 15, 2014 (see Note 14 for further details). For the three and six months ended June 30, 2012, net interest and other financial costs also includes a charge of $18 million associated with the April 2012 redemption of all of our $300 million Senior Notes due June 1, 2013.
See Note 13 for additional information on U. S. Steel’s use of derivatives to mitigate its foreign currency exchange rate exposure.

8.    Stock-Based Compensation Plans

U. S. Steel has outstanding stock-based compensation awards that were granted by the Compensation & Organization Committee of the Board of Directors (the Committee) under several stock-based employee compensation plans, which are more fully described in Note 12 of the United States Steel Corporation 2012 Annual Report on Form 10-K. An aggregate of 15,450,000 shares of U. S. Steel common stock may be issued under the plans. As of June 30, 2013, 1,662,363 shares are available for future grants.

U. S. Steel recognized pre-tax stock-based compensation cost in the amount of $9 million and $10 million in the three months ended June 30, 2013 and 2012, respectively, and $19 million in both the first six months of 2013 and 2012.

Recent grants of stock-based compensation consist of stock options, restricted stock units and performance awards. Historically, the Committee has granted traditional stock options with an exercise price equal to the stock price on the date of grant. For the May 2013 grant, premium-priced stock options with an exercise price of $25 per share were awarded to executives in lieu of traditional stock options. The following table is a general summary of the awards made under the Plan.

May 2013 Grant
 
May 2012 Grant
Grant Details
Shares (a)
Fair Value (b)
 
Shares (a)
Fair Value (b)
Executive Stock Options
483,900

$
8.50

 
456,070

$
11.95

Non-executive Stock Options
970,640

$
9.70

 
993,310

$
11.95

Restricted Stock Units
863,170

$
18.64

 
867,600

$
22.31

Performance Awards (c)
265,340

$
21.26

 
286,470

$
25.36

(a) The share amounts shown in this table do not reflect an adjustment for estimated forfeitures.
(b) Per share amounts.
(c) The number of Performance Awards shown represents the target value of the award.

As of June 30, 2013, total future compensation cost related to nonvested stock-based compensation arrangements was $53 million, and the weighted average period over which this cost is expected to be recognized is approximately 1.5 years.

Compensation expense for stock options is recorded over the vesting period based on the fair value on the date of grant, as calculated by U. S. Steel using the Black-Scholes model and the assumptions listed below. The stock options vest ratably over a three-year service period and have a term of ten years.


-10-



Black-Scholes Assumptions
 
May 2013 Executive Grant
 
May 2013 Non-Executive Grant
 
May 2012 Grant
Grant date price per share of option award
 
$
18.64

 
$
18.64

 
$
22.31

Exercise price per share of option award
 
$
25.00

 
$
18.64

 
$
22.31

Expected annual dividends per share, at grant date
 
$
0.20

 
$
0.20

 
$
0.20

Expected life in years
 
5.0

 
5.0

 
5.0

Expected volatility
 
67
%
 
67
%
 
68
%
Risk-free interest rate
 
1.049
%
 
1.049
%
 
0.8
%
Grant date fair value per share of unvested option awards as calculated from above
 
$
8.50

 
$
9.70

 
$
11.95


The expected annual dividends per share are based on the latest annualized dividend rate at the date of grant; the expected life in years is determined primarily from historical stock option exercise data; the expected volatility is based on the historical volatility of U. S. Steel stock; and the risk-free interest rate is based on the U.S. Treasury strip rate for the expected life of the option.

Restricted stock units generally vest ratably over three years. The fair value of the restricted stock units is the market price of the underlying common stock on the date of the grant.

Performance awards vest at the end of a three-year performance period as a function of U. S. Steel's total shareholder return compared to the total shareholder return of a group of peer companies over the three-year performance period. Performance awards can vest at between zero and 200 percent of the target award. The fair value of the performance awards is calculated using a Monte-Carlo simulation.
9.    Income Taxes
Tax provision
For the six months ended June 30, 2013 and 2012, we recorded a tax provision of $10 million on our pretax loss of $141 million and a tax provision of $166 million on our pretax income of $48 million, respectively. The tax provision does not reflect any tax benefit for pretax losses in Canada and Serbia (USSS was sold on January 31, 2012), which are jurisdictions where we have, or had, recorded full valuation allowances on deferred tax assets, and also does not reflect any tax provision or benefit for certain foreign currency remeasurement gains and losses that are not recognized in any tax jurisdiction. In addition, no significant tax benefit was recorded on the $399 million loss on the sale of USSS.
The tax provision for the first six months of 2013 is based on an estimated annual effective rate, which requires management to make its best estimate of annual pretax income or loss. During the year, management regularly updates forecasted annual pretax results for the various countries in which we operate based on changes in factors such as prices, shipments, product mix, plant operating performance and cost estimates. To the extent that actual 2013 pretax results for U.S. and foreign income or loss vary from estimates applied herein, the actual tax provision or benefit recognized in 2013 could be materially different from the forecasted amount used to estimate the tax provision for the six months ended June 30, 2013.
Unrecognized tax benefits
Unrecognized tax benefits are the differences between a tax position taken, or expected to be taken, in a tax return and the benefit recognized for accounting purposes pursuant to the guidance in ASC Topic 740 on income taxes. The total amount of gross unrecognized tax benefits was $87 million at June 30, 2013 and $85 million at December 31, 2012. The total amount of net unrecognized tax benefits that, if recognized, would affect the effective tax rate was $68 million and $65 million as of June 30, 2013 and December 31, 2012, respectively.
U. S. Steel records interest related to uncertain tax positions as a part of net interest and other financial costs in the Statement of Operations. Any penalties are recognized as part of selling, general and administrative expenses. As of both June 30, 2013 and December 31, 2012, U. S. Steel had accrued liabilities of $7 million for interest related to uncertain tax positions. U. S. Steel currently does not have a liability for tax penalties.

-11-



It is reasonably expected that during the next 12 months unrecognized tax benefits related to income tax issues will decrease by approximately $10 million.
Deferred taxes
As of June 30, 2013, the net domestic deferred tax asset was $415 million compared to $538 million at December 31, 2012. A substantial amount of U. S. Steel’s domestic deferred tax assets relates to employee benefits that will become deductible for tax purposes over an extended period of time as cash contributions are made to employee benefit plans and retiree benefits are paid in the future. We continue to believe it is more likely than not that the net domestic deferred tax asset will be realized.
As of June 30, 2013, the net foreign deferred tax asset was $58 million, net of established valuation allowances of $1,117 million. At December 31, 2012, the net foreign deferred tax asset was $57 million, net of established valuation allowances of $1,099 million. The net foreign deferred tax asset will fluctuate as the value of the U.S. dollar changes with respect to the euro and the Canadian dollar. At December 31, 2012, a full valuation allowance was recorded for the net Canadian deferred tax asset primarily due to cumulative losses in Canada in recent years.
If evidence changes and it becomes more likely than not that the Company will realize the net Canadian deferred tax asset, the valuation allowance would be partially or fully reversed. Any reversal of this amount would result in a decrease to income tax expense. The Slovak income tax rate increased from 19% to 23% starting in 2013. This change had an insignificant impact on deferred taxes at the end of 2012.

10.    Significant Equity Investments
Summarized unaudited income statement information for our significant equity investments for the six months ended June 30, 2013 and 2012 is reported below (amounts represent 100% of investee financial information):
(In millions)
 
2013
 
2012
Net sales
 
$
1,236

 
$
1,305

Cost of sales
 
937

 
915

Operating income
 
268

 
337

Net income
 
257

 
333

Net income attributable to significant equity investments
 
257

 
333

U. S. Steel’s portion of the equity in net income of the significant equity investments above was $23 million and $73 million for the six months ended June 30, 2013 and 2012, respectively, which is included in the income from investees line on the Consolidated Statement of Operations.
11.    Earnings and Dividends Per Common Share
Earnings Per Share Attributable to United States Steel Corporation Shareholders
Basic earnings per common share is based on the weighted average number of common shares outstanding during the period.
Diluted earnings per common share assumes the exercise of stock options, the vesting of restricted stock units and performance awards and the conversion of convertible notes, provided in each case the effect is dilutive. The “if-converted” method is used to calculate the dilutive effect of the Senior Convertible Notes due in 2014 and the “treasury stock” method is used to calculate the dilutive effect of the Senior Convertible Notes due in 2019 (due to our current intent and policy, among other factors, to settle the principal amount of the 2019 Senior Convertible Notes in cash upon conversion).

-12-



The computations for basic and diluted earnings per common share from continuing operations are as follows:
 
 
Three Months Ended June 30,
 
Six Months Ended June 30,
(Dollars in millions, except per share amounts)
 
2013
 
2012
 
2013
 
2012
Net (loss) income attributable to United States Steel
 

 

 

 

Corporation shareholders
 
$
(78
)
 
$
101

 
$
(151
)
 
$
(118
)
Plus income effect of assumed conversion-interest on convertible notes
 

 
6

 

 

Net (loss) income after assumed conversion
 
$
(78
)
 
$
107

 
$
(151
)
 
$
(118
)
Weighted-average shares outstanding (in thousands):
 

 

 

 

Basic
 
144,485

 
144,176

 
144,419

 
144,123

Effect of convertible notes
 

 
27,059

 

 

Effect of stock options, restricted stock units and performance awards
 

 
181

 

 

Adjusted weighted-average shares outstanding, diluted
 
144,485

 
171,416

 
144,419

 
144,123

Basic earnings per common share
 
$
(0.54
)
 
$
0.70

 
$
(1.05
)
 
$
(0.82
)
Diluted earnings per common share
 
$
(0.54
)
 
$
0.62

 
$
(1.05
)
 
$
(0.82
)
The following table summarizes the securities that were antidilutive, and therefore, were not included in the computations of diluted earnings per common share:
 
 
Three Months Ended June 30,
 
Six Months Ended June 30,
(In thousands)
 
2013
 
2012
 
2013
 
2012
Securities granted under the 2005 Stock Incentive Plan
 
7,177
 
4,330

 
7,177
 
5,575
Securities convertible under the Senior Convertible Notes
 
10,058
 

 
18,042
(a) 
27,059
Total
 
17,235
 
4,330

 
25,219
 
32,634
(a) On March 27, 2013, we repurchased approximately $542 million aggregate principal amount of our 4% Senior Convertible Notes due in 2014. If the repurchases had occurred on January 1, 2013, the antidilutive securities would be 10,058 for the six months ended June 30, 2013.
Dividends Paid Per Share
The dividend for each of the first and second quarters of 2013 and 2012 was five cents per common share.
12.    Inventories
Inventories are carried at the lower of cost or market. The first-in, first-out method is the predominant method of inventory costing in Europe and Canada. The last-in, first-out (LIFO) method is the predominant method of inventory costing in the United States. At June 30, 2013 and December 31, 2012, the LIFO method accounted for 59 percent and 56 percent of total inventory values, respectively.
(In millions)
 
June 30, 2013
 
December 31, 2012
Raw materials
 
$
860

 
$
945

Semi-finished products
 
820

 
883

Finished products
 
494

 
573

Supplies and sundry items
 
95

 
102

Total
 
$
2,269

 
$
2,503

Current acquisition costs were estimated to exceed the above inventory values by $1.0 billion at both June 30, 2013 and December 31, 2012. The effect of liquidations of LIFO inventories was insignificant in both the three

-13-



and six months ended June 30, 2013. Cost of sales was reduced by $6 million and $11 million in the three and six months ended June 30, 2012, respectively, as a result of liquidation of LIFO inventories.
Inventory includes $86 million of land held for residential or commercial development as of both June 30, 2013 and December 31, 2012.
13.    Derivative Instruments
U. S. Steel is exposed to foreign currency exchange rate risks as a result of our European and Canadian operations. USSE’s revenues are primarily in euros and costs are primarily in U.S. dollars and euros. USSC’s revenues and costs are denominated in both Canadian and U.S. dollars. In addition, foreign cash requirements have been, and in the future, may be funded by intercompany loans, creating intercompany monetary assets and liabilities in currencies other than the functional currency of the entities involved, which can affect income when remeasured at the end of each period.
U. S. Steel uses euro forward sales contracts with maturities no longer than 12 months to exchange euros for U.S. dollars to manage our currency requirements and exposure to foreign currency exchange rate fluctuations. Derivative instruments are required to be recognized at fair value in the balance sheet. U. S. Steel has not elected to designate these euro forward sales contracts as hedges. Therefore, changes in their fair value are recognized immediately in the results of operations. The gains and losses recognized on these euro forward sales contracts may also partially offset the accounting remeasurement gains and losses recognized on intercompany loans.
As of June 30, 2013, U. S. Steel held euro forward sales contracts with a total notional value of approximately $347 million. We mitigate the risk of concentration of counterparty credit risk by purchasing our forward sales contracts from several counterparties.
Additionally, we routinely enter into fixed-price forward physical purchase contracts to partially manage our exposure to price risk related to the purchases of natural gas and certain nonferrous metals used in the production process. During 2013 and 2012, the forward physical purchase contracts for natural gas and nonferrous metals qualified for the normal purchases and normal sales exemption described in ASC Topic 815 and were not subject to mark-to-market accounting.
The following summarizes the location and amounts of the fair values and gains or losses related to derivatives included in U. S. Steel’s financial statements as of June 30, 2013 and December 31, 2012 and for the three and six months ended June 30, 2013 and 2012:
 
 
 
 
Fair Value
 
Fair Value
(In millions)
 
Balance Sheet
Location
 
June 30, 2013
 
December 31, 2012
Foreign exchange forward contracts
 
Accounts receivable
 
$
2

 
$

Foreign exchange forward contracts
 
Accounts payable
 
$
5

 
$
12

 
 
Statement of
Operations
Location
 
Amount of Gain
(Loss)
 
Amount of Gain
(Loss)
(In millions)
 
 
Three Months Ended June 30, 2013
 
Six Months Ended June 30, 2013
Foreign exchange forward contracts
 
Other financial
costs
 
$
(7
)
 
$
4

 
 
Statement of
Operations
Location
 
Amount of Gain
(Loss)
 
Amount of Gain
(Loss)
(In millions)
 
 
Three Months Ended June 30, 2012
 
Six Months Ended June 30, 2012
Foreign exchange forward contracts
 
Other financial
costs
 
$
26

 
$
13


-14-



In accordance with the guidance found in ASC Topic 820 on fair value measurements and disclosures, the fair value of our euro forward sales contracts was determined using Level 2 inputs, which are defined as “significant other observable” inputs. The inputs used are from market sources that aggregate data based upon market transactions.
14.    Debt
(In millions)
 
Interest
Rates %
 
Maturity
 
June 30, 2013
 
December 31, 2012
2037 Senior Notes
 
6.65
 
2037
 
$
350

 
$
350

2022 Senior Notes
 
7.50
 
2022
 
400

 
400

2021 Senior Notes
 
6.875
 
2021
 
275

 

2020 Senior Notes
 
7.375
 
2020
 
600

 
600

2018 Senior Notes
 
7.00
 
2018
 
500

 
500

2017 Senior Notes
 
6.05
 
2017
 
450

 
450

2019 Senior Convertible Notes
 
2.75
 
2019
 
316

 

2014 Senior Convertible Notes
 
4.00
 
2014
 
321

 
863

Province Note (C$150 million)
 
1.00
 
2015
 
143

 
151

Environmental Revenue Bonds
 
5.38 - 6.88
 
2015 - 2042
 
549

 
549

Recovery Zone Facility Bonds
 
6.75
 
2040
 
70

 
70

Fairfield Caster Lease
 
 
 
2022
 
35

 
35

Other capital leases and all other obligations
 
 
 
2013 - 2014
 

 
1

Amended Credit Agreement
 
Variable
 
2016
 

 

USSK Revolver
 
Variable
 
2013
 

 

USSK credit facility
 
Variable
 
2015
 

 

Total Debt
 
 
 
 
 
4,009

 
3,969

Less Province Note fair value adjustment
 
 
 
 
 
18

 
23

Less unamortized discount
 
 
 
 
 
58

 
8

Less short-term debt and long-term debt due within one year
 
 
 
 
 
322

 
2

Long-term debt
 
 
 
 
 
$
3,611

 
$
3,936

To the extent not otherwise discussed below, information concerning the Senior Notes, the 2014 Senior Convertible Notes and other listed obligations can be found in Note 14 of the audited financial statements in the 2012 Annual Report on Form 10-K.
2021 Senior Notes
On March 26, 2013, U. S. Steel issued $275 million of 6.875% Senior Notes due April 1, 2021 (2021 Senior Notes). U. S. Steel received net proceeds from the offering of $270 million after fees of $5 million related to the underwriting discount and third party expenses. The net proceeds from the issuance of the 2021 Senior Notes, together with the net proceeds of the concurrent 2019 Senior Convertible Notes offering (see below), were used to repurchase a portion of our 4.00% Senior Convertible Notes due May 15, 2014 (the 2014 Senior Convertible Notes). Interest on the notes is payable semi-annually on April 1st and October 1st of each year, commencing on October 1, 2013.

-15-



U. S. Steel may redeem the 2021 Senior Notes, in whole or in part, at our option at any time and from time to time on or after April 1, 2017 at the redemption price for such notes set forth below as a percentage of the principal amount, plus accrued and unpaid interest to, but excluding, the redemption date, if redeemed during the twelve-month period beginning April 1 of the years indicated below:
Year
Redemption Price
2017
103.438
%
2018
101.719
%
2019 and thereafter
100.000
%
2019 Senior Convertible Notes
On March 26, 2013, U. S. Steel issued $316 million of 2.75% Senior Convertible Notes due April 1, 2019 (the 2019 Senior Convertible Notes). U. S. Steel received net proceeds from the offering of $306 million after fees of $10 million related to the underwriting discount and third party expenses. The net proceeds from the issuance of the 2019 Senior Convertible Notes, together with the net proceeds of the concurrent 2021 Senior Notes offering (see above), were used to repurchase a portion of our 2014 Senior Convertible Notes. Interest on the 2019 Senior Convertible Notes is payable semi-annually on April 1st and October 1st of each year, commencing on October 1, 2013.
The initial conversion rate for the 2019 Senior Convertible Notes is 39.5491 shares of U. S. Steel common stock per $1,000 principal amount, equivalent to an initial conversion price of approximately $25.29 per share of common stock, subject to adjustment as defined in the 2019 Senior Convertible Notes. On the issuance date of the 2019 Senior Convertible Notes, the market price of U. S. Steel’s common stock was below the stated conversion price of $25.29 so there was no beneficial conversion option to the holders. Based on the initial conversion rate, the 2019 Senior Convertible Notes are convertible into 12,507,403 shares of U. S. Steel common stock and we reserved for the possible issuance of 16,259,615 shares, which is the maximum amount that could be issued upon conversion. Holders may convert their notes at their option prior to the close of business on the business day immediately preceding October 1, 2018 only under certain circumstances (as described in the 2019 Senior Convertible Notes). On or after October 1, 2018, until the close of business on the second scheduled trading day immediately preceding the maturity date, holders may convert their 2019 Senior Convertible Notes at any time. Upon conversion, we will satisfy our conversion obligation by paying or delivering, as the case may be, cash, shares of our common stock or a combination of cash and shares of our common stock at our election. Any unconverted 2019 Senior Convertible Notes mature at par on April 1, 2019.
U. S. Steel may not redeem the 2019 Senior Convertible Notes prior to April 5, 2017. On or after April 5, 2017, we may redeem for cash all or part of the 2019 Senior Convertible Notes, at our option, under certain circumstances. The redemption price will equal 100% of the principal amount of the 2019 Senior Convertible Notes to be redeemed, plus accrued and unpaid interest to, but excluding, the redemption date.
If U. S. Steel undergoes a fundamental change, as defined in the 2019 Senior Convertible Notes, holders may require us to repurchase the 2019 Senior Convertible Notes in whole or in part for cash at a price equal to 100% of the principal amount of the 2019 Senior Convertible Notes to be purchased plus any accrued and unpaid interest (including additional interest, if any) up to, but excluding the repurchase date.
Although the 2019 Senior Convertible Notes were issued at par, for accounting purposes the proceeds received from the issuance of the notes are allocated between debt and equity to reflect the fair value of the conversion option embedded in the notes and the fair value of similar debt without the conversion option. As a result, $53 million of the gross proceeds of the 2019 Senior Convertible Notes was recorded as an increase in additional paid-in capital with the offsetting amount recorded as a debt discount. The debt discount will be amortized over the term of the 2019 Senior Convertible Notes using an interest rate of 6.2% (the estimated effective borrowing rate for nonconvertible debt at the time of issuance) which will accrete the carrying value of the notes to the principal amount at maturity. As of June 30, 2013, the remaining unamortized debt discount was $51 million and the net carrying amount of the 2019 Senior Convertible Notes was $265 million.
Similar to our other senior notes, the 2019 Senior Convertible Notes and the 2021 Senior Notes contain covenants limiting our ability to create liens, to enter into sale-leaseback transactions and to consolidate, merge or transfer all, or substantially all of our assets. They also contain provisions requiring the purchase of the notes

-16-



upon a change in control under certain specified circumstances, as well as other customary provisions. In addition, certain payment defaults on other indebtedness are a default under the 2019 Senior Convertible Notes.
2014 Senior Convertible Notes
In March 2013, U. S. Steel repurchased approximately $542 million aggregate principal amount of our 4.00% Senior Convertible Notes due 2014, reducing the outstanding principal amount of the notes to $321 million.
The repurchases were funded with the net proceeds from the 2021 Senior Notes and the 2019 Senior Convertible Notes and cash. The aggregate purchase price, including accrued and unpaid interest and fees, for the convertible notes repurchased was approximately $580 million. U. S. Steel recorded a pretax charge of $34 million to net interest and other financial costs (see Note 7) in the first six months of 2013 related mainly to the repurchase premiums.
Amended Credit Agreement
As of June 30, 2013, there were no amounts drawn on the Amended Credit Agreement, which expires July 20, 2016, and inventory values calculated in accordance with the Amended Credit Agreement supported the full $875 million of the facility. Under the Amended Credit Agreement, U. S. Steel must maintain a fixed charge coverage ratio (as further defined in the Amended Credit Agreement) of at least 1.00 to 1.00 for the most recent four consecutive quarters when availability under the Amended Credit Agreement is less than the greater of 10% of the total aggregate commitments and $87.5 million. Since availability was greater than $87.5 million, compliance with the fixed charge coverage ratio covenant was not applicable. Based on the most recent four quarters as of June 30, 2013, we would not meet this covenant. If the value of inventory does not support the full amount of the facility or we remain unable to meet this covenant in the future, the full amount of this facility would not be available to the Company.
Receivables Purchase Agreement
As of June 30, 2013, U. S. Steel has a Receivables Purchase Agreement (RPA) under which eligible trade accounts receivable are sold, on a daily basis without recourse, to U. S. Steel Receivables, LLC (USSR), a wholly owned, bankruptcy-remote, special purpose entity used only for the securitization program. As U. S. Steel accesses this facility, USSR sells senior undivided interests in the receivables to certain third-party commercial paper conduits, while maintaining a subordinated undivided interest in a portion of the receivables. U. S. Steel has agreed to continue servicing the sold receivables at market rates.
At both June 30, 2013 and December 31, 2012, eligible accounts receivable supported $625 million of availability under the RPA and there were no receivables sold to third-party conduits under this facility.
USSR pays the conduits a discount based on the conduits’ borrowing costs plus incremental fees. We paid $1 million in each of the three month periods ended June 30, 2013 and 2012 and $2 million in each of the six month periods ended June 30, 2013 and 2012 relating to fees on the RPA. These costs are included in other financial costs in the statement of operations.
Generally, the facility provides that as payments are collected from the sold accounts receivables, USSR may elect to have the conduits reinvest the proceeds in new eligible accounts receivable. As there was no activity under this facility during the six months ended June 30, 2013, there were no collections reinvested. During the six months ended June 30, 2012, collection of accounts receivable of approximately $1,175 million were reinvested.
The eligible accounts receivable and receivables sold to third-party conduits are summarized below:
(In millions)
 
June 30, 2013
 
December 31, 2012
Balance of accounts receivable-net, eligible for sale to third-party conduits
 
$
1,128

 
$
1,127

Accounts receivable sold to third-party conduits
 

 

Balance included in Receivables on the balance sheet of U. S. Steel
 
$
1,128

 
$
1,127

The net book value of U. S. Steel’s retained interest in the receivables represents the best estimate of the fair market value due to the short-term nature of the receivables. The retained interest in the receivables is recorded net of the allowance for bad debts, which historically have not been significant.

-17-



The facility may be terminated on the occurrence and failure to cure certain events, including, among others, failure of USSR to maintain certain ratios related to the collectability of the receivables and failure to make payment under its material debt obligations and may also be terminated upon a change of control. The facility was scheduled to expire in July 2014; however, on July 12, 2013, U. S. Steel entered into an amendment of the RPA that extended the expiration to July 2016.
Change in control event
In the event of a change in control of U. S. Steel, debt obligations totaling $3,212 million at June 30, 2013, which includes the Senior Notes and Senior Convertible Notes, may be declared immediately due and payable. In addition, the Amended Credit Agreement, RPA and the USSK €200 million revolving credit facility may be terminated and any amount outstanding thereunder may be declared immediately due and payable. In such event, U. S. Steel may also be required to either repurchase the leased Fairfield slab caster for $41 million or provide a letter of credit to secure the remaining obligation.
U. S. Steel Košice (USSK) credit facilities
At June 30, 2013, USSK had no borrowings under its €200 million (approximately $262 million) unsecured revolving credit facility.

On July 15, 2013, USSK entered into a €200 million revolving credit facility agreement (the Credit Agreement) that replaced USSK's €200 million credit facility that was scheduled to expire in August 2013. The Credit Agreement contains certain USSK financial covenants (as further defined in the Credit Agreement) as well as other customary terms and conditions. The Credit Agreement expires in July 2016.
At June 30, 2013, USSK had no borrowings under its €20 million unsecured credit facility (which approximated $26 million) and the availability was approximately $24 million due to approximately $2 million of customs and other guarantees outstanding.
15.    Asset Retirement Obligations
U. S. Steel’s asset retirement obligations (AROs) primarily relate to mine and landfill closure and post-closure costs. The following table reflects changes in the carrying values of AROs:
(In millions)
 
June 30, 2013
 
December 31, 2012
 
 
Balance at beginning of year
 
$
33

 
$
38

 
 
Additional obligations incurred
 

 
2

 
 
Obligations settled
 
(4
)
 
(9
)
 
(a) 
Accretion expense
 
2

 
2

 
 
Balance at end of period
 
$
31

 
$
33

 
 
(a) Includes $2 million as a result of the sale of USSS on January 31, 2012. See Note 4 for additional details.
Certain AROs related to disposal costs of the majority of fixed assets at our integrated steel facilities have not been recorded because they have an indeterminate settlement date. These AROs will be initially recognized in the period in which sufficient information exists to estimate their fair value.
16.    Fair Value of Financial Instruments
The carrying value of cash and cash equivalents, current accounts and notes receivable, accounts payable, bank checks outstanding and accrued interest included in the Consolidated Balance Sheet approximate fair value. See Note 13 for disclosure of U. S. Steel’s derivative instruments, which are accounted for at fair value on a recurring basis.

-18-



The following table summarizes U. S. Steel’s financial assets and liabilities that were not carried at fair value at June 30, 2013 and December 31, 2012.
 
 
June 30, 2013
 
December 31, 2012
(In millions)
 
Fair
Value
 
Carrying
Amount
 
Fair
Value
 
Carrying
Amount
Financial assets:
 

 

 

 

Investments and long-term receivables (a)
 
$
66

 
$
66

 
$
39

 
$
39

Financial liabilities:
 

 

 

 

Debt (b)
 
$
3,962

 
$
3,898

 
$
4,113

 
$
3,902

(a) Excludes equity method investments.
(b) Excludes capital lease obligations.
The following methods and assumptions were used to estimate the fair value of financial instruments included in the table above:
Investments and long-term receivables: Fair value was based on Level 2 inputs which were discounted cash flows. U. S. Steel is subject to market risk and liquidity risk related to its investments.
Long-term debt instruments: Fair value was determined using Level 2 inputs which were derived from quoted market prices and is based on the yield on public debt where available or current borrowing rates available for financings with similar terms and maturities.
Fair value of the financial assets and liabilities disclosed herein is not necessarily representative of the amount that could be realized or settled, nor does the fair value amount consider the tax consequences of realization or settlement.
Financial guarantees are U. S. Steel’s only unrecognized financial instrument. For details relating to financial guarantees see Note 20.

-19-



17.    Statement of Changes in Stockholders’ Equity

The following table reflects the first six months of 2013 and 2012 reconciliation of the carrying amount of total equity, equity attributable to United States Steel Corporation and equity attributable to the noncontrolling interests:
Six Months Ended June 30, 2013 (In millions)
 
Total
 
Comprehensive
Income (Loss)
 
Retained
Earnings
 
Accumulated
Other
Comprehensive
Income (Loss)
 
Common
Stock
 
Treasury
Stock
 
Paid-in
Capital
 
Non-
Controlling
Interest
Balance at beginning of year
 
$
3,478

 

 
$
3,463

 
$
(3,268
)
 
$
151

 
$
(521
)
 
$
3,652

 
$
1

Comprehensive income:
 

 

 

 

 

 

 

 

Net loss
 
(151
)
 
(151
)
 
(151
)
 

 

 

 

 

Other comprehensive income (loss), net of tax:
 

 

 

 

 

 

 

 

Pension and other benefit adjustments
 
138

 
138

 

 
138

 

 

 

 

Currency translation adjustment
 
(18
)
 
(18
)
 

 
(18
)
 

 

 

 

Issuance of conversion option in 2019 Senior Convertible Notes, net of tax
 
31

 

 

 

 

 

 
31

 

Employee stock plans
 
12

 

 

 

 

 
39

 
(27
)
 

Dividends paid on common stock
 
(14
)
 

 
(14
)
 

 

 

 

 

Other
 
(2
)
 

 
(2
)
 

 

 

 

 

Balance at June 30, 2013
 
$
3,474

 
$
(31
)
 
$
3,296

 
$
(3,148
)
 
$
151

 
$
(482
)
 
$
3,656

 
$
1

Six Months Ended June 30, 2012 (In millions)
 
Total
 
Comprehensive
Income (Loss)
 
Retained
Earnings
 
Accumulated
Other
Comprehensive
Income (Loss)
 
Common
Stock
 
Treasury
Stock
 
Paid-in
Capital
 
Non-
Controlling
Interest
Balance at beginning of year
 
$
3,501

 

 
$
3,616

 
$
(3,367
)
 
$
151

 
$
(550
)
 
$
3,650

 
$
1

Comprehensive income:
 

 

 

 

 

 

 

 

Net loss
 
(118
)
 
(118
)
 
(118
)
 

 

 

 

 

Other comprehensive income (loss), net of tax:
 

 

 

 

 

 

 

 

Pension and other benefit adjustments
 
136

 
136

 

 
136

 

 

 

 

Currency translation adjustment
 
16

 
16

 

 
16

 

 

 

 

Employee stock plans
 
12

 

 

 

 

 
29

 
(17
)
 

Dividends paid on common stock
 
(14
)
 

 
(14
)
 

 

 

 

 

Balance at June 30, 2012
 
$
3,533

 
$
34

 
$
3,484

 
$
(3,215
)
 
$
151

 
$
(521
)
 
$
3,633

 
$
1


-20-






18.    Reclassifications from Accumulated Other Comprehensive Income (AOCI)
(In millions) (a)
 
Pension and
Other Benefit
Items
 
Foreign
Currency
Items
 
Total
Balance at December 31, 2012
 
$
(3,613
)
 
$
345

 
$
(3,268
)
Other comprehensive income before reclassifications
 
2

 
(18
)
 
(16
)
Amounts reclassified from AOCI (b)
 
136

 

 
136

Net current-period other comprehensive income
 
138

 
(18
)
 
120

Balance at June 30, 2013
 
$
(3,475
)
 
$
327

 
$
(3,148
)
(a)All amounts are net of tax. Amounts in parentheses indicate debits.
(b)See table below for further details.
 
 
 
 
Amount reclassified
from AOCI
 
(In millions) (a)
 
Details about AOCI components
 
Three Months Ended June 30, 2013
 
Six Months Ended June 30, 2013
 
 
 
Amortization of pension and other benefit items
 
 
 
 
 
 
 
Prior service costs
 
$
(2
)
(b) 
$
(5
)
(b) 
 
 
Actuarial gains/(losses)
 
(98
)
(b) 
(198
)
(b) 
 
 
Total before tax
 
(100
)
 
(203
)
 
 
 
Tax benefit
 
33

 
67

 
 
 
Net of tax
 
$
(67
)
 
$
(136
)
 
(a)Amounts in parentheses indicate debits to income/loss.
(b) 
These AOCI components are included in the computation of net periodic benefit cost (see Note 6 for additional details).
19.    Related Party Transactions
Net sales to related parties and receivables from related parties primarily reflect sales of steel products to equity investees. Generally, transactions are conducted under long-term market-based contractual arrangements. Related party sales and service transactions were $310 million and $322 million for the three months ended June 30, 2013 and 2012, respectively, and $588 million and $661 million for the six months ended June 30, 2013 and 2012, respectively.
Purchases from related parties for outside processing services provided by equity investees amounted to $16 million and $15 million for the three months ended June 30, 2013 and 2012, respectively, and $35 million and $28 million for the six months ended June 30, 2013 and 2012, respectively. Purchases of iron ore pellets from related parties amounted to $53 million and $61 million for the three months ended June 30, 2013 and 2012, respectively and $117 million and $120 million for the six months ended June 30, 2013 and 2012, respectively.
Accounts payable to related parties include amounts collected on behalf of PRO-TEC Coating Company (PRO-TEC) of $90 million and $75 million at June 30, 2013 and December 31, 2012, respectively. U. S. Steel, as PRO-TEC’s exclusive sales agent, is responsible for credit risk related to PRO-TEC’s receivables. U. S. Steel also provides PRO-TEC marketing, selling and customer service functions. Payables to other related parties totaled $3 million at both June 30, 2013 and December 31, 2012.

-21-



20.    Contingencies and Commitments
U. S. Steel is the subject of, or party to, a number of pending or threatened legal actions, contingencies and commitments involving a variety of matters, including laws and regulations relating to the environment. Certain of these matters are discussed below. The ultimate resolution of these contingencies could, individually or in the aggregate, be material to the consolidated financial statements. However, management believes that U. S. Steel will remain a viable and competitive enterprise even though it is possible that these contingencies could be resolved unfavorably.
U. S. Steel accrues for estimated costs related to existing lawsuits, claims and proceedings when it is probable that it will incur these costs in the future.
Asbestos matters As of June 30, 2013, U. S. Steel was a defendant in approximately 805 active cases involving approximately 3,345 plaintiffs. Many of these cases involve multiple defendants (typically from fifty to more than one hundred). About 2,560, or approximately 77 percent, of these plaintiff claims are currently pending in jurisdictions which permit filings with massive numbers of plaintiffs. Based upon U. S. Steel’s experience in such cases, it believes that the actual number of plaintiffs who ultimately assert claims against U. S. Steel will likely be a small fraction of the total number of plaintiffs. During the six months ended June 30, 2013, U. S. Steel paid approximately $5 million in settlements. These settlements and other dispositions resolved approximately 110 claims. New case filings in the first six months of 2013 added approximately 125 claims. At December 31, 2012, U. S. Steel was a defendant in approximately 790 active cases involving approximately 3,330 plaintiffs. During 2012, U. S. Steel paid approximately $15 million in settlements. These settlements and other dispositions resolved approximately 190 claims. New case filings in the year ended December 31, 2012 added approximately 285 claims. Most claims filed in 2013 and 2012 involved individual or small groups of claimants as many jurisdictions no longer permit the filing of mass complaints.
Historically, these claims against U. S. Steel fall into three major groups: (1) claims made by persons who allegedly were exposed to asbestos at U. S. Steel facilities (referred to as “premises claims”); (2) claims made by industrial workers allegedly exposed to products manufactured by U. S. Steel; and (3) claims made under certain federal and general maritime laws by employees of former operations of U. S. Steel. In general, the only insurance available to U. S. Steel with respect to asbestos claims is excess casualty insurance, which has multi-million dollar retentions. To date, U. S. Steel has received minimal payments under these policies relating to asbestos claims.
These asbestos cases allege a variety of respiratory and other diseases based on alleged exposure to asbestos. U. S. Steel is currently a defendant in cases in which a total of approximately 260 plaintiffs allege that they are suffering from mesothelioma. The potential for damages against defendants may be greater in cases in which the plaintiffs can prove mesothelioma.
In many cases in which claims have been asserted against U. S. Steel, the plaintiffs have been unable to establish any causal relationship to U. S. Steel or its products or premises; however, with the decline in mass plaintiff cases, the incidence of claimants actually alleging a claim against U. S. Steel is increasing. In addition, in many asbestos cases, the claimants have been unable to demonstrate that they have suffered any identifiable injury or compensable loss at all; that any injuries that they have incurred did in fact result from alleged exposure to asbestos; or that such alleged exposure was in any way related to U. S. Steel or its products or premises.
The amount U. S. Steel has accrued for pending asbestos claims is not material to U. S. Steel’s financial position. U. S. Steel does not accrue for unasserted asbestos claims because it is not possible to determine whether any loss is probable with respect to such claims or even to estimate the amount or range of any possible losses. The vast majority of pending claims against U. S. Steel allege so-called “premises” liability-based alleged exposure on U. S. Steel’s current or former premises. These claims are made by an indeterminable number of people such as truck drivers, railroad workers, salespersons, contractors and their employees, government inspectors, customers, visitors and even trespassers. In most cases the claimant also was exposed to asbestos in non-U. S. Steel settings; the relative periods of exposure between U. S. Steel and non-U. S. Steel settings vary with each claimant; and the strength or weakness of the causal link between U. S. Steel exposure and any injury vary widely as do the nature and severity of the injury claimed.
We are unable to estimate the ultimate outcome of asbestos-related lawsuits, claims and proceedings due to the unpredictable nature of personal injury litigation. Despite this uncertainty, management believes that the ultimate resolution of these matters will not have a material adverse effect on U. S. Steel’s financial condition,

-22-



although the resolution of such matters could significantly impact results of operations for a particular quarter. Among the factors considered in reaching this conclusion are: (1) it has been many years since U. S. Steel employed maritime workers or manufactured or sold asbestos containing products; (2) most asbestos containing material was removed or remediated at U. S. Steel facilities many years ago; and (3) U. S. Steel’s history of trial outcomes, settlements and dismissals.
Environmental matters U. S. Steel is subject to federal, state, local and foreign laws and regulations relating to the environment. These laws generally provide for control of pollutants released into the environment and require responsible parties to undertake remediation of hazardous waste disposal sites. Penalties may be imposed for noncompliance. Changes in accrued liabilities for remediation activities are summarized in the following table:
(In millions)
Six Months Ended June 30, 2013
Beginning of period
$
203

Accruals for environmental remediation deemed probable and reasonably estimable
5

Payments
(7
)
End of period
$
201

Accrued liabilities for remediation activities are included in the following balance sheet lines:
(In millions)
 
June 30, 2013
 
December 31, 2012
Accounts payable
 
$
17

 
$
21

Deferred credits and other noncurrent liabilities
 
184

 
182

Total
 
$
201

 
$
203

Expenses related to remediation are recorded in cost of sales and totaled $1 million and $6 million for the three months ended June 30, 2013 and 2012, respectively and $5 million and $9 million for the six months ended June 30, 2013 and 2012, respectively. It is not presently possible to estimate the ultimate amount of all remediation costs that might be incurred. Due to uncertainties inherent in remediation projects and the associated liabilities, it is possible that total remediation costs for active matters and projects with ongoing study and scope development may exceed the accrued liabilities by as much as 20 to 40 percent.
Remediation Projects
U. S. Steel is involved in environmental remediation projects at or adjacent to several current and former U. S. Steel facilities and other locations that are in various stages of completion ranging from initial characterization through post-closure monitoring. Based on the anticipated scope and degree of uncertainty of projects, we categorize projects as follows:
(1)
Projects with Ongoing Study and Scope Development are those projects which are still in the study and development phase. For these projects the extent of remediation that may be required is not yet known, the remediation methods and plans are not yet developed, and cost estimates cannot be determined. Therefore, material costs, in addition to the accrued liabilities for these projects, are reasonably possible.
(2)
Significant Projects with Defined Scope are those projects with significant accrued liabilities, a defined scope and little likelihood of material additional costs.
(3)
Other Projects are those projects with relatively small accrued liabilities for which we believe that, while additional costs are possible, they are not likely to be material, and those projects for which we do not yet possess sufficient information to estimate potential costs to U. S. Steel.
Projects with Ongoing Study and Scope Development – There are six environmental remediation projects where reasonably possible additional costs for completion are not currently estimable, but could be material. These are four Resource Conservation and Recovery Act (RCRA) program projects (at Fairfield Works, Lorain Tubular, USS-POSCO Industries (UPI) and the Fairless Plant), the St. Louis Estuary and Upland project in Duluth,

-23-



Minnesota and a voluntary remediation program project at the former steel making plant at Joliet, Illinois. As of June 30, 2013, accrued liabilities for these projects totaled $23 million for the costs of ongoing studies, investigations, and design. The St. Louis Estuary and Upland project was previously considered a "significant project with defined scope"; however, further studies are being conducted which are likely to result in an expanded scope. It is reasonably possible that additional liabilities associated with future requirements regarding studies, investigations, design and remediation for these projects could be as much as $45 million to $75 million. Depending on agency negotiations and other factors, the UPI and the St. Louis Estuary and Upland projects may become defined in 2013.
Significant Projects with Defined Scope – As of June 30, 2013, a total of $59 million was accrued for projects at or related to Gary Works where the scope of work is defined.
An additional project with defined scope greater than or equal to $5 million consists of a project at U. S. Steel’s former Geneva Works in Geneva, Utah. As of June 30, 2013, the accrued liability for this project totaled $65 million. U. S. Steel does not expect material additional costs related to this project.
Other Projects – There are six other environmental remediation projects which each had an accrued liability of between $1 million and $5 million. The total accrued liability for these projects at June 30, 2013 was $13 million. These projects have progressed through a significant portion of the design phase and material additional costs are not expected.
The remaining environmental remediation projects each had an accrued liability of less than $1 million. The total accrued liability for these projects at June 30, 2013 was $7 million. We do not foresee material additional liabilities for any of these sites.
Post-Closure Costs – Accrued liabilities for post-closure site monitoring and other costs at various closed landfills totaled $28 million at June 30, 2013 and were based on known scopes of work.
Administrative and Legal Costs – As of June 30, 2013, U. S. Steel had an accrued liability of $6 million for administrative and legal costs related to environmental remediation projects. These accrued liabilities were based on projected administrative and legal costs for the next three years and have not changed significantly from year to year.
Capital Expenditures For a number of years, U. S. Steel has made substantial capital expenditures to bring existing facilities into compliance with various laws relating to the environment. In the first six months of 2013 and 2012, such capital expenditures totaled $24 million and $29 million, respectively. U. S. Steel anticipates making additional such expenditures in the future; however, the exact amounts and timing of such expenditures are uncertain because of the continuing evolution of specific regulatory requirements.
CO2 Emissions – Current and potential regulation of Greenhouse Gas (GHG) emissions remains a significant issue for the steel industry, particularly for integrated steel producers such as U. S. Steel. The regulation of carbon dioxide (CO2) emissions has either become law or is being considered by legislative bodies of many nations, including countries where we have operating facilities. The European Union (EU) has established GHG regulations based upon national allocations and a cap and trade system. In Canada, both the federal and Ontario governments have issued proposed requirements for GHG emissions. In the United States, the Environmental Protection Agency (EPA) has published rules for regulating GHG emissions for certain facilities and has implemented various reporting requirements as further described below. In 2010, GHG legislation was passed in the House of Representatives and introduced in the Senate. The federal courts are considering several suits that challenge the EPA’s authority to regulate GHG emissions under the Clean Air Act. We do not know what action, if any, may be taken by the current or future sessions of Congress.
The EU has issued regulations under their cap and trade system for the period 2013-2020 (NAP III) that are more stringent than those in NAP II. USSK has not yet been advised of its free allocation for NAP III.
On May 13, 2010, the EPA published its final Greenhouse Gas Tailoring Rule establishing a mechanism for regulating GHG emissions from facilities through the Clean Air Act’s Prevention of Significant Deterioration (PSD) permitting process. U. S. Steel reported its emissions under these rules in accordance with the regulation and its deadlines. Since 2011, new projects that increase GHG emissions by more than 75,000 tons per year have new PSD requirements based on best available control technology (BACT), but only if the project also significantly increases emissions of at least one non-GHG pollutant. Only existing sources with Title V permits or new sources obtaining Title V permits for non-GHG pollutants will also be required to address GHG emissions.

-24-



As of July 1, 2011, new sources not already subject to Title V requirements that emit over 100,000 tons per year, or modifications to existing permits that increase GHG emissions by more than 75,000 tons per year, are subject to PSD and Title V requirements. On November 17, 2010 the EPA issued its “PSD and Title V Permitting Guidance for Greenhouse Gases” and “Available and Emerging Technologies for Reducing Greenhouse Gas Emissions from the Iron and Steel Industry.” With this guidance, EPA intends to help state and local air permitting authorities identify greenhouse gas reductions under the Clean Air Act. Additionally, the EPA revised the National Ambient Air Quality Standards (NAAQS) for nitrogen oxide, sulfur dioxide and lead in 2010 and is in the process of revising the NAAQS for 2.5 micron particulate matter, ozone and sulfur dioxides.
It is impossible to estimate the timing or impact of these or other future government action on U. S. Steel, although it could be significant. Such impacts may include substantial capital expenditures, costs for emission allowances, restriction of production, and higher prices for coking coal, natural gas and electricity generated by carbon based systems.
European Union (EU) Environmental Requirements – Slovakia is currently considering a law implementing an EU Waste Framework Directive that would more strictly regulate waste disposal and increase fees for waste disposed of in landfills including privately owned landfills. The intent of the waste directive is to encourage recycling and because Slovakia has not adopted implementing legislation, we cannot estimate the full financial impact of this prospective legislation at this time.
The EU’s Industry Emission Directive will require implementation of EU determined best available techniques (BATs) to reduce environmental impacts as well as compliance with BAT associated emission levels. It contains operational requirements for air emissions, waste water discharges, solid waste disposal and energy conservation, dictates certain operating practices and imposes stricter emission limits. Producers will be required to be in compliance with the iron and steel BAT by March 8, 2016. We are evaluating the costs of complying with BAT, but our most recent broad estimate of likely capital expenditures is $300 million to $400 million over the 2013 to 2016 period. We are currently investigating the possibility of obtaining EU grants to fund a portion of those capital expenditures. We also believe that there will be increased operating costs, such as increased energy and maintenance costs, but we are currently unable to reliably estimate them.
Environmental and other indemnifications – Throughout its history, U. S. Steel has sold numerous properties and businesses and many of these sales included indemnifications and cost sharing agreements related to the assets that were sold. These indemnifications and cost sharing agreements have related to the condition of the property, the approved use, certain representations and warranties, matters of title and environmental matters. While most of these provisions have not specifically dealt with environmental issues, there have been transactions in which U. S. Steel indemnified the buyer for non-compliance with past, current and future environmental laws related to existing conditions and there can be questions as to the applicability of more general indemnification provisions to environmental matters. Most recent indemnifications and cost sharing agreements are of a limited nature only applying to non-compliance with past and/or current laws. Some indemnifications and cost sharing agreements only run for a specified period of time after the transactions close and others run indefinitely. In addition, current owners of property formerly owned by U. S. Steel may have common law claims and contribution rights against U. S. Steel for environmental matters. The amount of potential environmental liability associated with these transactions and properties is not estimable due to the nature and extent of the unknown conditions related to the properties sold. Aside from the environmental liabilities already recorded as a result of these transactions due to specific environmental remediation activities and cases (included in the $201 million of accrued liabilities for remediation discussed above), there are no other known environmental liabilities related to these transactions.
Guarantees – The maximum guarantees of the indebtedness of unconsolidated entities of U. S. Steel totaled $29 million at June 30, 2013. In the event that any default related to the guaranteed indebtedness occurs, U. S. Steel has access to its interest in the assets of the investees to reduce its potential losses under the guarantees.
Antitrust Class Actions – In a series of lawsuits filed in federal court in the Northern District of Illinois beginning September 12, 2008, individual direct or indirect buyers of steel products have asserted that eight steel manufacturers, including U. S. Steel, conspired in violation of antitrust laws to restrict the domestic production of raw steel and thereby to fix, raise, maintain or stabilize the price of steel products in the United States. The cases are filed as class actions and claim treble damages for the period 2005 to present, but do not allege any damage amounts. U. S. Steel is vigorously defending these lawsuits and does not believe that it is probable a

-25-



liability regarding these matters has been incurred. We are unable to estimate a range of possible loss at this time.
EPA Region V Federal Lawsuit – On August 1, 2012, the U.S. government, joined by the States of Illinois, Indiana and Michigan, filed a complaint in the Northern District of Indiana alleging various CAA and State air regulatory violations that were to have allegedly occurred at Gary Works, Granite City Works, and Great Lakes Works, our three integrated iron and steel facilities located in EPA Region V. The Complaint alleges that Gary Works failed to obtain the proper pre-construction permit for a routine reline of its Blast Furnace No. 4 in 1990, and that the three facilities failed to meet certain operational, maintenance, opacity, and recordkeeping requirements under the CAA and its implementing regulations. The Complaint requests relief in the form of statutory penalties for each violation and for injunctive relief. U. S. Steel believes that the claims asserted in the Complaint are not justified and are without statutory foundation. On September 21, 2012, U. S. Steel filed a motion to dismiss the U.S. government’s claims for relief regarding the 1990 reline of the Gary Blast Furnace No. 4 and filed an answer to the remaining allegations in the Complaint. On January 24, 2013, the Court heard oral arguments regarding the motion to dismiss. The motion is still pending before the Court. U. S. Steel will continue to vigorously defend against these claims. At this time, the potential outcome is not reasonably estimable.
Randle Reef – The Canadian and Ontario governments have identified for remediation a sediment deposit, commonly referred to as Randle Reef, in Hamilton Harbor near USSC’s Hamilton Works, for which the regulatory agencies estimate expenditures with a net present value of approximately C$120 million (approximately $114 million). The national and provincial governments have each allocated C$40 million (approximately $38 million) for this project. Local sources, including industry, have also agreed to provide funding of C$40 million (approximately $38 million) for this project. USSC has committed to contribute approximately 11,000 tons of hot rolled steel and to fund C$2 million (approximately $2 million). The steel contribution is expected to be made in 2014. As of June 30, 2013, U. S. Steel has an accrued liability of approximately $9 million reflecting the contribution commitment.
Other contingencies Under certain operating lease agreements covering various equipment, U. S. Steel has the option to renew the lease or to purchase the equipment at the end of the lease term. If U. S. Steel does not exercise the purchase option by the end of the lease term, U. S. Steel guarantees a residual value of the equipment as determined at the lease inception date (totaling approximately $16 million at June 30, 2013). No liability has been recorded for these guarantees as the potential loss is not probable.
Insurance U. S. Steel maintains insurance for certain property damage, equipment, business interruption and general liability exposures; however, insurance is applicable only after certain deductibles and retainages. U. S. Steel is self-insured for certain other exposures including workers’ compensation (where permitted by law) and auto liability. Liabilities are recorded for workers’ compensation and personal injury obligations. Other costs resulting from losses under deductible or retainage amounts or not otherwise covered by insurance are charged against income upon occurrence.
U. S. Steel uses surety bonds, trusts and letters of credit to provide whole or partial financial assurance for certain obligations such as workers’ compensation. The total amount of active surety bonds, trusts and letters of credit being used for financial assurance purposes was approximately $166 million as of June 30, 2013, which reflects U. S. Steel’s maximum exposure under these financial guarantees, but not its total exposure for the underlying obligations. Most of the trust arrangements and letters of credit are collateralized by restricted cash. Restricted cash, which is recorded in other current and noncurrent assets, totaled $147 million at June 30, 2013, of which $2 million was classified as current, and $181 million at December 31, 2012, of which $5 million was classified as current. Restricted cash at June 30, 2013 also includes $55 million to fund certain capital projects at Gary Works, our Clairton Plant and Granite City Works. The proceeds become unrestricted as capital expenditures for these projects are made.
Capital Commitments At June 30, 2013, U. S. Steel’s contractual commitments to acquire property, plant and equipment totaled $215 million.

-26-



Contractual Purchase Commitments – U. S. Steel is obligated to make payments under contractual purchase commitments, including unconditional purchase obligations. Payments for contracts with remaining terms in excess of one year are summarized below (in millions):
Remainder of 2013
 
2014
 
2015
 
2016
 
2017
 
Later
Years
 
Total
$393
 
$725
 
$349
 
$331
 
$322
 
$1,723
 
$
3,843

The majority of U. S. Steel’s unconditional purchase obligations relates to the supply of industrial gases, energy and utility services with terms ranging from two to 15 years. Unconditional purchase obligations also include coke and steam purchase commitments related to a coke supply agreement with Gateway Energy & Coke Company LLC under which Gateway is obligated to supply 90 percent to 105 percent of the expected annual capacity of the heat recovery coke plant at our Granite City Works, and U. S. Steel is obligated to purchase the coke from Gateway at the contract price. As of June 30, 2013, a maximum default payment of approximately $255 million would apply if U. S. Steel terminates the agreement.
Total payments relating to unconditional purchase obligations were approximately $112 million and $185 million for the three months ended June 30, 2013 and 2012, respectively and $295 million and $370 million for the six months ended June 30, 2013 and 2012, respectively.

21.    Subsequent Events
    
On July 1, 2013, U. S. Steel entered into a supplier contract dispute settlement agreement. As a result of the agreement, U. S. Steel expects to record a pre-tax gain of $23 million in the third quarter of 2013.

On July 12, 2013, U. S. Steel entered into an amendment of the Receivables Purchase Agreement. On July 15, 2013, USSK entered into a €200 million revolving credit facility agreement that replaced USSK's €200 million credit facility that was scheduled to expire in August 2013. See Note 14 for additional details.

-27-




Item 2.
MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
Certain sections of Management’s Discussion and Analysis include forward-looking statements concerning trends or events potentially affecting the businesses of United States Steel Corporation (U. S. Steel). These statements typically contain words such as “anticipates,” “believes,” “estimates,” “expects,” “intends” or similar words indicating that future outcomes are not known with certainty and are subject to risk factors that could cause these outcomes to differ significantly from those projected. In accordance with “safe harbor” provisions of the Private Securities Litigation Reform Act of 1995, these statements are accompanied by cautionary language identifying important factors, though not necessarily all such factors that could cause future outcomes to differ materially from those set forth in forward-looking statements. For discussion of risk factors affecting the businesses of U. S. Steel, see Item 1A. Risk Factors and “Supplementary Data – Disclosures About Forward-Looking Statements” in U. S. Steel’s Annual Report on Form 10-K for the year ended December 31, 2012. References in this Quarterly Report on Form 10-Q to “U. S. Steel,” “the Company,” “we,” “us” and “our” refer to U. S. Steel and its consolidated subsidiaries unless otherwise indicated by the context.
RESULTS OF OPERATIONS
Net sales by segment for the second quarter and first six months of 2013 and 2012 are set forth in the following table:
 
 
Quarter Ended
June 30,
 
 
 
Six Months Ended June 30,
 
(Dollars in millions, excluding intersegment sales)
 
2013
 
2012
 
%
Change
 
2013
 
2012
%
Change
Flat-rolled Products (Flat-rolled)
 
$
2,876

 
$
3,356

 
(14
)%
 
$
5,979

 
$
6,656

(10
)%
U. S. Steel Europe (USSE)
 
778

 
763

 
2
 %
 
1,561

 
1,578

(1
)%
Tubular Products (Tubular)
 
709

 
871

 
(19
)%
 
1,395

 
1,817

(23
)%
     Total sales from reportable segments
 
4,363

 
4,990

 
(13
)%
 
8,935

 
10,051

(11
)%
Other Businesses
 
66

 
27

 
144
 %
 
89

 
138

(36
)%
Net sales
 
$
4,429

 
$
5,017

 
(12
)%
 
$
9,024

 
$
10,189

(11
)%
Management’s analysis of the percentage change in net sales for U. S. Steel’s reportable business segments for the quarter ended June 30, 2013 versus the quarter ended June 30, 2012 is set forth in the following table:
Quarter Ended June 30, 2013 versus Quarter Ended June 30, 2012
 
 
Steel Products (a)
 
 
 
 
 
 
Volume
 
Price
 
Mix
 
FX (b)
 
Coke &
Other
 
Net
Change
Flat-rolled
 
(4
)%
 
(7
)%
 
0%

 
0%

 
(3
)%
 
(14
)%
USSE
 
11
 %
 
(9
)%
 
(2
)%
 
2
%
 
0%

 
2
 %
Tubular
 
(11
)%
 
(7
)%
 
0%

 
0%

 
(1
)%
 
(19
)%
(a) Excludes intersegment sales
(b) Foreign currency translation effects
Net sales were $4,429 million in the second quarter of 2013, compared with $5,017 million in the same quarter last year. The decrease in sales for the Flat-rolled segment primarily reflected lower shipments (decrease of 258 thousand tons) and average realized prices (decrease of $47 per ton) primarily due to service center destocking which placed downward pressure on spot market pricing in the second quarter of 2013 as compared to the same period in 2012. The increase in sales for the European segment was primarily due to higher shipments (increase of 107 thousand tons) offset by decreased average realized euro-based prices (decrease of 60 per ton). The decrease in sales for the Tubular segment reflected lower average realized prices (decrease of $196 per ton) and decreased shipments (decrease of 37 thousand tons), primarily as a result of decreased drilling activity in the second quarter of 2013 as compared to the same period in 2012.

-28-



Management’s analysis of the percentage change in net sales for U. S. Steel’s reportable business segments for the six months ended June 30, 2013 versus the six months ended June 30, 2012 is set forth in the following table:

Six Months Ended June 30, 2013 versus Six Months Ended June 30, 2012
 
 
Steel Products (a)
 
 
 
 
 
 
Volume
 
Price
 
Mix
 
FX (b)
 
Coke &
Other
 
Net
Change
Flat-rolled
 
(3
)%
 
(6
)%
 
0%

 
0%

 
(1
)%
 
(10
)%
USSE
 
6
 %
 
(6
)%
 
(2
)%
 
1
%
 
0%

 
(1
)%
Tubular
 
(13
)%
 
(10
)%
 
1
 %
 
0%

 
(1
)%
 
(23
)%
(a) Excludes intersegment sales
(b) Foreign currency translation effects
Net sales were $9,024 million in the first six months of 2013, compared with $10,189 million in the same period last year. The decrease in sales for the Flat-rolled segment primarily reflected lower shipments (decrease of 332 thousand tons) and average realized prices (decrease of $46 per ton) primarily due to service center destocking which placed downward pressure on spot market prices in the first six months of 2013 as compared to the same period in 2012. The slight decrease in sales for the European segment was primarily due to decreased average realized euro-based prices (decrease of 43 per ton) offset by increased shipments (increase of 110 thousands tons). The decrease in sales for the Tubular segment primarily reflected lower average realized prices (decrease of $185 per ton) and shipments (decrease of 138 thousand tons) primarily as a result of decreased drilling activity in the first six months of 2013 as compared to the same period in 2012.
Pension and other benefits costs
Pension and other benefit costs are reflected in our cost of sales and selling, general and administrative expense line items in the Consolidated Statements of Operations.
Defined benefit and multiemployer pension plan costs totaled $96 million and $191 million in the second quarter and first six months of 2013, respectively compared to $103 million and $203 million in the comparable periods in 2012. The $7 million and $12 million decrease for the quarter and six month periods ended June 30, 2013, respectively, is primarily due to the natural maturation of our pension plans and a higher market related value of assets.
Other benefit costs totaled $14 million and $28 million in the second quarter and first six months of 2013, respectively, compared to $30 million and $60 million in the comparable periods in 2012. The $16 million and $32 million decrease for the quarter and six month periods ended June 30, 2012, respectively, is primarily due to benefit and plan design changes in the 2012 Labor Agreements.
Net periodic pension cost, including multiemployer plans, is expected to total approximately $385 million in 2013. Total other benefits costs in 2013 are expected to total approximately $55 million.

-29-



A sensitivity analysis of the projected incremental effect of a hypothetical one percentage point change in the significant inputs used in the calculation of pension and other benefits net periodic benefit costs is provided in the following table:
 
 
Hypothetical Rate
Increase (Decrease)
(Dollars in millions)
 
1%
 
(1%)
Expected return on plan assets
 
 
 
 
Incremental (decrease) increase in:
 
 
 
 
Net periodic pension cost
 
$
(103
)
 
$
103

Discount rate
 
 
 
 
Incremental (decrease) increase in:
 
 
 
 
Net periodic pension & other benefits costs
 
$
(58
)
 
$
53

Health care cost escalation trend rates
 
 
 
 
Incremental increase (decrease) in:
 
 
 
 
Service and interest cost components for 2013
 
$
11

 
$
(9
)
Costs related to defined contribution plans totaled $11 million and $22 million in the second quarter and first six months of 2013, respectively, compared to $11 million and $21 million in the comparable periods in 2012.
Selling, general and administrative expenses
Selling, general and administrative expenses were $151 million and $296 million in the second quarter and first six months of 2013 compared to $165 million and $331 million in the second quarter and first six months of 2012. The decrease is primarily related to lower other benefit costs as noted above.
Income (loss) from operations by segment for the second quarter and the first six months of 2013 and 2012 is set forth in the following table:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Quarter Ended
June 30,
 
%
Change
 
Six Months Ended June 30,
 
 
%
Change
(Dollars in millions)
 
2013
 
2012
 
 
2013
 
2012
 
 
Flat-rolled
 
$
(51
)
 
$
177

 
(129
)%
 
$
(64
)
 
$
360

 
 
(118
)%
USSE
 
10

 
34

 
(71
)%
 
48

 

(a) 
 
100
 %
Tubular
 
45

 
103

 
(56
)%
 
109

 
232

 
 
(53
)%
Total income from reportable segments
 
4

 
314

 
(99
)%
 
93

 
592

 
 
(84
)%
Other Businesses
 
43

 
16

 
169
 %
 
48

 
33

 
 
45
 %
Segment income from operations
 
47

 
330

 
(86
)%
 
141

 
625

 
 
(77
)%
Postretirement benefit expense
 
(54
)
 
(77
)
 
(30
)%
 
(110
)
 
(154
)
 
 
(29
)%
Other items not allocated to segments:
 
 
 
 
 
 
 
 
 
 
 
 
 
Net loss on sale of assets
 

 

 


 

 
(310
)
 
 
100
 %
Property tax settlements
 

 

 


 

 
19

 
 
(100
)%
Total (loss) income from operations
 
$
(7
)
 
$
253

 
(103
)%
 
$
31

 
$
180

 
 
(83
)%
(a) Includes income from operations for USSK of $17 million for the six months ended June 30, 2012.

-30-



Segment results for Flat-rolled
 
 
Quarter Ended
June 30,
 
%
Change
 
Six Months Ended June 30,
 
% Change
 
 
2013
 
2012
 
 
2013
 
2012
 
(Loss) income from operations ($ millions)
 
$
(51
)
 
$
177

 
(129
)%
 
$
(64
)
 
$
360

 
(118
)%
Gross margin
 
5
%
 
10
%
 
(5
)%
 
5
%
 
10
%
 
(5
)%
Raw steel production (mnt)
 
4,212

 
4,688

 
(10
)%
 
9,132

 
9,731

 
(6
)%
Capability utilization
 
70
%
 
77
%
 
(7
)%
 
76
%
 
80
%
 
(4
)%
Steel shipments (mnt)
 
3,728

 
3,986

 
(6
)%
 
7,746

 
8,078

 
(4
)%
Average realized steel price per ton
 
$
725

 
$
772

 
(6
)%
 
$
722

 
$
768

 
(6
)%
The decrease in Flat-rolled results in the second quarter of 2013 compared to the same period in 2012 resulted from a decrease in average realized prices (approximately $225 million), increased energy costs, primarily due to higher natural gas costs (approximately $45 million), lower steel substrate sales to our Tubular segment (approximately $35 million), a decrease in shipment volumes (approximately $30 million) and lower income from our joint ventures (approximately $25 million). These changes were partially offset by lower raw material costs (approximately $115 million) and lower costs for employee profit sharing (approximately $20 million).
The decrease in Flat-rolled results in the first half of 2013 compared to the same period in 2012 resulted from a decrease in average realized prices (approximately $425 million), lower steel substrate sales to our tubular segment (approximately $75 million), increased energy costs, primarily due to higher natural gas costs (approximately $60 million), a decrease in shipment volumes (approximately $40 million) and lower income from our joint ventures (approximately $40 million). These changes were partially offset by lower raw material costs (approximately $170 million) and lower costs for employee profit sharing (approximately $45 million).
During the second quarter of 2013, U. S. Steel and our partner decided to dissolve Double Eagle Steel Coating Company (DESCO), our 50-50 joint venture. DESCO operates an electrogalvanizing facility located in Dearborn, Michigan. The dissolution could take up to two years as the joint venture will continue to service customers during that period. We do not expect a significant financial impact as a result of the dissolution. The joint venture will accelerate depreciation of the fixed assets, which will reduce our investment in the joint venture, over the remaining useful life of the fixed assets.
Segment results for USSE(a) 
 
 
Quarter Ended
June 30,
 
%
Change
 
Six Months Ended June 30,
 
% Change
 
 
2013
 
2012
 
 
2013
 
2012
 
Income from operations ($ millions)
 
$
10

 
$
34

 
(71
)%
 
$
48

 
$

 
100
 %
Gross margin
 
7
%
 
12
%
 
(5
)%
 
9
%
 
8
%
 
1
 %
Raw steel production (mnt)
 
1,158

 
1,173

 
(1
)%
 
2,361

 
2,413

 
(2
)%
Capability utilization
 
93
%
 
94
%
 
(1
)%
 
95
%
 
89
%
 
6
 %
Steel shipments (mnt)
 
1,062

 
955

 
11
 %
 
2,110

 
2,000

 
6
 %
Average realized steel price per ton
 
$
702

 
$
767

 
(8
)%
 
$
710

 
$
757

 
(6
)%
(a) 
The six months ended June 30, 2012 includes one month of activity for U. S. Steel Serbia (USSS), which was sold on January 31, 2012.
The decrease in USSE results in the second quarter of 2013 compared to the same period in 2012 was primarily due to lower average realized prices (approximately $75 million) and increased other operating costs (approximately $10 million). These changes were partially offset by lower raw material costs (approximately $50 million) and increased shipment volumes (approximately $10 million).
The improvement in USSE results in the first half of 2013 compared to the same period in 2012 was primarily due to lower raw material costs (approximately $130 million), the elimination of operating losses subsequent to January 31, 2012 associated with our former Serbian operations (which were approximately $20 million) and increased shipment

-31-



volumes (approximately $10 million). These improvements were partially offset by decreased average realized prices (approximately $110 million).
Segment results for Tubular
 
 
Quarter Ended
June 30,
 
%
Change
 
Six Months Ended June 30,
 
% Change
 
 
2013
 
2012
 
 
2013
 
2012
 
Income from operations ($ millions)
 
$
45

 
$
103

 
(56
)%
 
$
109

 
$
232

 
(53
)%
Gross margin
 
12
%
 
15
%
 
(3
)%
 
13
%
 
16
%
 
(3
)%
Steel shipments (mnt)
 
456

 
493

 
(8
)%
 
884

 
1,022

 
(14
)%
Average realized steel price per ton
 
$
1,510

 
$
1,706

 
(11
)%
 
$
1,532

 
$
1,717

 
(11
)%
The decrease in Tubular results in the second quarter of 2013 as compared to the same period in 2012 resulted mainly from decreased average realized prices (approximately $80 million) and a decrease in shipment volumes (approximately $15 million). These decreases were partially offset by lower substrate costs (approximately $40 million).
The decrease in Tubular results in the first half of 2013 as compared to the same period in 2012 resulted mainly from decreased average realized prices (approximately $140 million) and a decrease in shipment volumes (approximately $60 million). These decreases were partially offset by lower substrate costs (approximately $75 million).
Results for Other Businesses
Other Businesses had income of $43 million and $48 million in the second quarter and first six months of 2013, compared to income of $16 million and $33 million in the second quarter and first six months of 2012. The 2013 results include a gain of approximately $30 million from a real estate sale in the second quarter of 2013.
Items not allocated to segments
The decrease in postretirement benefit expense in the second quarter and first half 2013 as compared to the same period in 2012 resulted from lower pension expense due to the natural maturation of the pension plans and lower retiree medical expense as a result of benefit and plan design changes, particularly the adoption of a fully insured plan for a large number of Medicare eligible participants.
We recorded a $310 million pretax net loss on the sale of assets in the first half of 2012 which consisted of a pretax loss of $399 million related to the sale of USSS and a pretax gain of $89 million related to the sale of a majority of the operating assets of the Birmingham Southern Railroad.
We recorded a pretax gain of $19 million related to property tax settlements that occurred in the first half of 2012. This was reflected as a reduction to our cost of sales.
Net interest and other financial costs
 
 
Quarter Ended
June 30,
 
%
Change
 
Six Months Ended
June 30,
 
%
Change
(Dollars in millions)
 
2013
 
2012
 
 
2013
 
2012
 
Interest expense
 
$
58

 
$
66

 
(12
)%
 
$
143

 
$
115

 
24
 %
Interest income
 
(1
)
 
(1
)
 

 
(2
)
 
(5
)
 
(60
)%
Other financial costs
 
11

 
17

 
(35
)%
 
31

 
22

 
41
 %
   Total net interest and other financial costs
 
$
68

 
$
82

 
(17
)%
 
$
172

 
$
132

 
30
 %
The decrease in net interest and other financial costs in the second quarter of 2013 as compared to the same period last year was primarily due to an $18 million charge recorded in the second quarter of 2012 associated with the redemption of all of our $300 million 5.65% Senior Notes due June 1, 2013 partially offset by a decrease in capital projects subject to capitalized interest in the second quarter of 2013.

-32-



The increase in net interest and other financial costs in the first six months of 2013 as compared to the same period last year was due to a $34 million charge recorded in the first quarter of 2013 related to the repurchases of a portion of our 4.00% Senior Convertible Notes due 2014 (see Note 14) and a decrease in capital projects subject to capitalized interest in the first six months of 2013 partially offset by the absence of an $18 million charge recorded in the second quarter of 2012 associated with the redemption of all of our $300 million 5.65% Senior Notes due June 1, 2013.
The income tax provision was $3 million and $10 million in the second quarter and first six months of 2013 compared to $70 million and $166 million in the second quarter and first six months of 2012. The tax provision does not reflect any tax benefit for pretax losses in Canada and Serbia (USSS was sold on January 31, 2012), which are jurisdictions where we have, or had, recorded a full valuation allowance on deferred tax assets, and also does not reflect any tax provision or benefit for certain foreign currency remeasurement gains and losses that are not recognized in any tax jurisdiction.
The tax provision for the first six months of 2013 is based on an estimated annual effective rate, which requires management to make its best estimate of annual pretax income or loss. During the year, management regularly updates forecasted annual pretax results for the various countries in which we operate based on changes in factors such as prices, shipments, product mix, operating performance and cost estimates. To the extent that actual 2013 pretax results for U.S. and foreign income or loss vary from estimates used herein at the end of the most recent interim period, the actual tax provision or benefit recognized in 2013 could be materially different from the forecasted amount used to estimate the tax provision for the six months ended June 30, 2013.
The net domestic deferred tax asset was $415 million at June 30, 2013 compared to $538 million at December 31, 2012. A substantial amount of U. S. Steel’s domestic deferred tax assets relates to employee benefits that will become deductible for tax purposes over an extended period of time as cash contributions are made to employee benefit plans and retiree benefits are paid in the future. We continue to believe it is more likely than not the net domestic deferred tax asset will be realized.
At June 30, 2013, the net foreign deferred tax asset was $58 million, net of established valuation allowances of $1,117 million. At December 31, 2012, the net foreign deferred tax asset was $57 million, net of established valuation allowances of $1,099 million. At December 31, 2012, a full valuation allowance was recorded for the net Canadian deferred tax asset primarily due to cumulative losses in Canada in recent years. The net foreign deferred tax asset will fluctuate as the value of the U.S. dollar changes with respect to the euro and the Canadian dollar. If evidence changes and it becomes more likely than not that the Company will realize the net Canadian deferred tax asset, the valuation allowance would be partially or fully reversed. Any reversal of this amount would result in a decrease to income tax expense.
For further information on income taxes see Note 9 to the Consolidated Financial Statements.
Net loss attributable to United States Steel Corporation was $78 million and $151 million in the second quarter and first six months of 2013. Net income (loss) attributable to United States Steel Corporation was $101 million and ($118) million in the second quarter and first six months of 2012. The changes between the 2013 and 2012 periods primarily reflect the factors discussed above.
BALANCE SHEET
Inventories decreased by $234 million from year-end 2012 primarily due to a reduction in raw materials and finished goods inventories.
Deferred income tax benefits decreased by $122 million from year-end 2012 primarily due to the effects of employee related benefits and the early adoption of ASU 2013-11 (see Note 2 for further details).
Short-term debt and current maturities of long-term debt increased by $320 million from year-end 2012 primarily due to the reclassification of $321 million of 4.00% Senior Notes due May 2014 from long-term debt.
Long-term debt, less unamortized discount decreased by $325 million primarily due to the reclassification of $321 million of 4.00% Senior Notes due May 2014 from long-term debt to current maturities of long-term debt.
Employee benefits decreased by $294 million from year-end 2012 primarily due to benefit payments made in excess of the net periodic benefit expense recognized in the first six months of 2013, and the strengthening of the U.S. Dollar versus the Canadian Dollar.


-33-



CASH FLOW
Net cash provided by operating activities was $384 million for the first six months of 2013 compared to $861 million in the same period last year. The decrease is primarily due to lower financial results, excluding a net loss of $309 million on the sale of assets in the first quarter of 2012, and changes in working capital period over period. Additionally, in the first six months of 2012, we made a $140 million voluntary pension contribution to our main defined benefit pension plan. There were no such contributions in the first six months of 2013; however, we anticipate making additional voluntary contributions later in 2013, as discussed in Note 6.
Changes in working capital can vary significantly depending on factors such as the timing of inventory production and purchases, which is affected by the length of our business cycles as well as our captive raw materials position, customer payments of accounts receivable and payments to vendors in the regular course of business.
Our key working capital components include accounts receivable and inventory. The accounts receivable and inventory turnover ratios for the three months and twelve months ended June 30, 2013 and 2012 are as follows:
 
 
Three Months Ended
June 30,
 
Twelve Months Ended
June 30,
 
 
2013
 
2012
 
2013
 
2012
Accounts Receivable Turnover
 
2.0

 
2.0

 
7.9

 
7.8

Inventory Turnover
 
1.8

 
1.8

 
7.2

 
7.2

Capital expenditures, in the first six months of 2013, were $221 million, compared with $397 million in the same period in 2012. Flat-rolled capital expenditures were $176 million and included spending for construction of carbon alloy facilities (coke substitute), a major rehabilitation of the No. 8 Blast Furnace at Gary Works, ongoing implementation of an enterprise resource planning (ERP) system and various other infrastructure and environmental projects. Tubular capital expenditures of $23 million related to an upgrade to the Lorain No. 4 Seamless Hot Mill, infrastructure, environmental and strategic capital projects. USSE capital expenditures of $18 million consisted of spending for infrastructure and environmental projects.
U. S. Steel’s contractual commitments to acquire property, plant and equipment at June 30, 2013, totaled $215 million.
Capital expenditures for 2013 are expected to total approximately $710 million and remain focused largely on strategic, infrastructure and environmental projects. We have recently completed or neared completion on several key projects of strategic importance. We have made significant progress to improve our coke self-sufficiency and reduce our reliance on purchased coke for the steel making process through the application of advanced technologies, upgrades to our existing coke facilities and increased use of natural gas and pulverized coal in our operations. We have completed the construction of a technologically and environmentally advanced battery at the Mon Valley Works’ Clairton Plant with a projected capacity of 960,000 tons per year. Initial start-up of the battery began in November 2012 and the battery has reached full production capacity. We have been constructing a two module carbon alloy facility at Gary Works, which utilizes an environmentally compliant, energy efficient and flexible production technology to produce a coke substitute product. The facility has a projected capacity of 500,000 tons per year when both modules are completed. Construction of the first module is complete, and we continue to focus on the optimization and reliability of operations of that module. We have slowed construction activities on the second module at this time based on current economic conditions, our coke requirements in North America and additional work on the first module.
In an effort to increase our participation in the automotive market as vehicle emission and safety requirements become increasingly stringent, PRO-TEC Coating Company, our joint venture in Ohio with Kobe Steel, Ltd., has a new automotive continuous annealing line (CAL) that began operations during the first quarter of 2013 and was financed by the joint venture.
We are also continuing our efforts to implement an ERP system to replace our existing information technology systems, which will enable us to operate more efficiently. The completion of the ERP project is expected to provide further opportunities to streamline, standardize and centralize business processes in order to maximize cost effectiveness, efficiency and control across our global operations. We are also currently developing additional projects within our Tubular segment, such as facility enhancements and additional premium connections that will further enhance our ability to support our Tubular customers’ evolving needs.

-34-



Over the longer term, we are considering business strategies to leverage our significant iron ore position in the United States and to exploit opportunities related to the availability of reasonably priced natural gas as an alternative to coke in the iron reduction process to improve our cost competitiveness, while reducing our dependence on coal and coke. We are considering an expansion of our iron ore pellet operations at our Keewatin, MN (Keetac) facility which would increase our production capability by approximately 3.6 million tons thereby increasing our iron ore self-sufficiency. The total cost of this project as currently conceived is broadly estimated to be approximately $820 million. Final permitting for the expansion was completed in December 2011. We are examining alternative iron and steel making technologies such as gas-based, direct-reduced iron and electric arc furnace (EAF) steelmaking. Our capital investments in the future may reflect such strategies, although we expect that iron and steel-making through the blast furnace and basic oxygen furnace manufacturing processes will remain our primary processing technology for the long term.
The foregoing statements regarding expected 2013 capital expenditures, capital projects and expected benefits from the implementation of the ERP project are forward-looking statements. Factors that may affect our capital spending and the projects include: (i) levels of cash flow from operations; (ii) changes in tax laws; (iii) general economic conditions; (iv) steel industry conditions; (v) cost and availability of capital; (vi) receipt of necessary permits; and (vii) unforeseen hazards such as contractor performance, material shortages, weather conditions, explosions or fires. There is also a risk that the completed projects will not produce at the expected levels and within the costs currently projected. Predictions regarding benefits resulting from the implementation of the ERP project are subject to uncertainties. Actual results could differ materially from those expressed in these forward-looking statements.
Disposal of assets in the first six months of 2012 primarily reflects proceeds from the sale of the majority of the operating assets of Birmingham Southern Railroad Company and the Port Birmingham Terminal.
Restricted cash in the first six months of 2013 primarily reflects a reduction in the use of collateralized letters of credit, which were replaced with surety bonds as well as the use of proceeds from our environmental revenue bonds due 2042 . These proceeds are restricted for certain environmental capital projects at our Gary Works, our Clairton Plant and Granite City Works and become unrestricted as capital expenditures for these projects are made. At June 30, 2013, $55 million of this restricted cash remains.
Borrowings against revolving credit facilities in the first six months of 2012 reflect amounts drawn under USSK’s unsecured revolving credit facilities.
Repayments of revolving credit facilities in the first six months of 2012 reflect USSK’s repayment of the outstanding borrowings under its unsecured revolving credit facilities.
Receivables Purchase Agreement Payments in the first six months of 2012 reflect activity under the Receivables Purchase Agreement.
Issuance of long-term debt, net of financing costs in the first six months of 2013 reflects the issuance of $316 million of 2.75% Senior Convertible Notes due 2019 and $275 million of 6.875% Senior Notes due April 2021. U. S. Steel received net proceeds of $576 million after fees related to the underwriting discounts and third party expenses. The first six months of 2012 reflects the issuance of $400 million of 7.50% Senior Notes due 2022. U. S. Steel received net proceeds of $392 million after fees related to the underwriting discounts and third party expenses.
Repayment of long-term debt in the first six months of 2013 reflects the repurchase of $542 million aggregate principal amount of our 4.00% Senior Convertible Notes. Repayment of long-term debt in the first six months of 2012 primarily reflects the redemption of our $300 million 5.65% Senior Notes.
LIQUIDITY AND CAPITAL RESOURCES
The following table summarizes U. S. Steel’s liquidity as of June 30, 2013:
(Dollars in millions)

 

Cash and cash equivalents
$
767

 
Amount available under $875 Million Credit Facility(a)
788


Amount available under Receivables Purchase Agreement
625


Amount available under USSK credit facilities
286


Total estimated liquidity
$
2,466


-35-



(a) As of June 30, 2013, there were no amounts drawn and inventory levels supported the full $875 million capacity of the facility. Since availability under the Amended Credit Agreement was greater than $87.5 million, compliance with the fixed charge coverage ratio was not applicable. However, based on the most recent four quarters, as of June 30, 2013, we would not meet the fixed charge coverage ratio. Therefore, we reduced the availability in the above table to $787.5 million.
As of June 30, 2013, $327 million of the total cash and cash equivalents was held by our foreign subsidiaries, which is indefinitely reinvested. Substantially all of the liquidity attributable to our foreign subsidiaries can be accessed without the imposition of income taxes through repayment of intercompany loans.
On March 26, 2013, U. S. Steel issued $316 million of 2.75% Convertible Senior Notes due 2019 and $275 million of 6.875% Senior Notes due 2021. U. S. Steel received net proceeds of $576 million from the issuances. The net proceeds were used to repurchase $542 million aggregate principal amount of our 4.00% Senior Convertible Notes due 2014.
As of June 30, 2013, there were no amounts drawn under our $875 million credit facility agreement (Amended Credit Agreement) and inventory values calculated in accordance with the Amended Credit Agreement supported the full $875 million of the facility. Under the Amended Credit Agreement, U. S. Steel must maintain a fixed charge coverage ratio (as further defined in the Amended Credit Agreement) of at least 1.00 to 1.00 for the most recent four consecutive quarters when availability under the Amended Credit Agreement is less than the greater of 10% of the total aggregate commitments and $87.5 million. Based on the most recent four quarters as of June 30, 2013, we would not meet this covenant. If the value of inventory does not support the full amount of the facility or we remain unable to meet this covenant in the future, the full amount of this facility would not be available to the Company.
As of June 30, 2013, U. S. Steel has a Receivables Purchase Agreement (RPA) that provides liquidity and letters of credit depending upon the number of eligible domestic receivables generated by U. S. Steel. As of June 30, 2013, eligible accounts receivable supported the maximum amount eligible for sale of $625 million and there were no outstanding borrowings under this facility.
At June 30, 2013, USSK had no borrowings under its 200 million (approximately $262 million) unsecured revolving credit facility.
At June 30, 2013, USSK had no borrowings under its 20 million unsecured credit facilities (which approximated $26 million) and the availability was approximately $24 million due to approximately $2 million of outstanding customs and other guarantees.
We may from time to time seek to retire or purchase our outstanding long-term debt in open market purchases, privately negotiated transactions, exchange transactions or otherwise. Such purchases or exchanges, if any, will depend on prevailing market conditions, our liquidity requirements, contractual restrictions and other factors and may be commenced or suspended at any time. The amounts involved may be material.
We use surety bonds, trusts and letters of credit to provide financial assurance for certain transactions and business activities. The use of some forms of financial assurance and collateral have a negative impact on liquidity. U. S. Steel has committed $86 million of liquidity sources for financial assurance purposes as of June 30, 2013.
At June 30, 2013, in the event of a change in control of U. S. Steel, debt obligations totaling $3,212 million, which includes the Senior Notes and the Senior Convertible Notes, may be declared immediately due and payable. In addition, the Amended Credit Agreement, RPA and the USSK €200 million revolving credit facility may be terminated and any amount outstanding thereunder may be declared immediately due and payable. In such an event, U. S. Steel may also be required to either repurchase the leased Fairfield slab caster for $41 million or provide a letter of credit to secure the remaining obligation.
The maximum guarantees of the indebtedness of unconsolidated entities of U. S. Steel totaled $29 million at June 30, 2013. In the event that any default related to the guaranteed indebtedness occurs, U. S. Steel has access to its interest in the assets of the investees to reduce its potential losses under the guarantees.
Our major cash requirements in 2013 are expected to be for capital expenditures, employee benefits and operating costs, including purchases of raw materials. We finished the second quarter of 2013 with $767 million of cash and cash equivalents and $2.5 billion of total liquidity. Available cash is left on deposit with financial institutions or invested in highly liquid securities with parties we believe to be creditworthy.
U. S. Steel management believes that U. S. Steel’s liquidity will be adequate to satisfy our obligations for the foreseeable future, including obligations to complete currently authorized capital spending programs. Future

-36-



requirements for U. S. Steel’s business needs, including the funding of acquisitions and capital expenditures, scheduled debt maturities, contributions to employee benefit plans, and any amounts that may ultimately be paid in connection with contingencies, are expected to be financed by a combination of internally generated funds (including asset sales), proceeds from the sale of stock, borrowings, refinancings and other external financing sources.
Our opinion regarding liquidity is a forward-looking statement based upon currently available information. To the extent operating cash flow is materially lower than recent levels or external financing sources are not available on terms competitive with those currently available, future liquidity may be adversely affected.
Off-balance Sheet Arrangements
U. S. Steel did not enter into any new material off-balance sheet arrangements during the second quarter of 2013.
Environmental Matters, Litigation and Contingencies
U. S. Steel has incurred and will continue to incur substantial capital, operating and maintenance, and remediation expenditures as a result of environmental laws and regulations. In recent years, these expenditures have been mainly for process changes in order to meet Clean Air Act (CAA) obligations and similar obligations in Europe and Canada, although ongoing compliance costs have also been significant. To the extent that these expenditures, as with all costs, are not ultimately reflected in the prices of our products and services, operating results will be reduced. U. S. Steel believes that our major North American and many European integrated steel competitors are confronted by substantially similar conditions and thus does not believe that our relative position with regard to such competitors is materially affected by the impact of environmental laws and regulations. However, the costs and operating restrictions necessary for compliance with environmental laws and regulations may have an adverse effect on our competitive position with regard to domestic mini-mills, some foreign steel producers (particularly in developing economies such as China) and producers of materials which compete with steel, all of which may not be required to incur equivalent costs in their operations. In addition, the specific impact on each competitor may vary depending on a number of factors, including the age and location of its operating facilities and its production methods. U. S. Steel is also responsible for remediation costs related to our prior disposal of environmentally sensitive materials. Many of our competitors do not have similar historical liabilities.
Our U.S. facilities are subject to the U.S. environmental standards, including the CAA, the Clean Water Act (CWA), the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as well as state and local laws and regulations.
U. S. Steel Canada (USSC) is subject to the environmental laws of Canada, which are comparable to environmental standards in the United States. Environmental regulation in Canada is an area of shared responsibility between the federal government and the provincial governments, which in turn delegate certain matters to municipal governments. Federal environmental statutes include the federal Canadian Environmental Protection Act, 1999 and the Fisheries Act. Various provincial statutes regulate environmental matters such as the release and remediation of hazardous substances; waste storage, treatment and disposal; and releases to air and water. As in the United States, Canadian environmental laws (federal, provincial and local) are undergoing revision and becoming more stringent.
USSK is subject to the environmental laws of Slovakia and the European Union (EU). A related law of the EU commonly known as Registration, Evaluation, Authorization and Restriction of Chemicals, Regulation 1907/2006 (REACH) requires the registration of certain substances that are produced in the EU or imported into the EU. Although USSK is currently compliant with REACH, this regulation is becoming increasingly stringent. Slovakia is also currently considering a law implementing an EU Waste Framework Directive that would more strictly regulate waste disposal and increase fees for waste disposed of in landfills including privately owned landfills. The intent of the waste directive is to encourage recycling and because Slovakia has not adopted implementing legislation, we cannot estimate the full financial impact of this prospective legislation at this time.
The EU’s Industry Emission Directive will require implementation of EU determined best available techniques (BATs) to reduce environmental impacts as well as compliance with BAT associated emission levels. It contains operational requirements for air emissions, wastewater discharges, solid waste disposal and energy conservation, dictates certain operating practices and imposes stricter emission limits. Producers will be required to be in compliance with the iron and steel BAT by March 8, 2016. We are currently evaluating the costs of complying with BAT, but our most recent broad estimate of likely capital expenditures is $300 million to $400 million over the 2013 to 2016 period. We are currently investigating the possibility of obtaining EU grants to fund a portion of those capital expenditures. We also believe there will be increased operating costs, such as increased energy and maintenance costs, but we are currently unable to reliably estimate them.

-37-



A Memorandum of Understanding was signed in March of 2013 between U. S. Steel and the government of Slovakia. The Memorandum of Understanding outlines areas in which the government and U. S. Steel will work together to help create a more competitive environment and conditions for USSK. Some of the incentives the government of Slovakia agreed to provide, as an effort to reduce USSK’s cost structure, include participation in a renewable energy program that provides the opportunity to reduce electricity costs as well as the potential for government grants and other support concerning investments in environmental control technology that may be required under the recently implemented BAT requirements. The ultimate economic value of these actions is subject to many developments and uncertainties but based on current electricity tariffs, management estimates annual energy savings of approximately 15 million, which are expected to begin in 2016. There are many conditions and uncertainties regarding the grants, including matters controlled by the EU, but the value could be as much as 75 million. In return, U. S. Steel agreed to achieve employment level reduction goals at USSK only through the use of natural attrition, except in cases of extreme economic conditions, as outlined in USSK's current collective labor agreement. Additionally, U. S. Steel agreed to pay the government of Slovakia specified declining amounts should U. S. Steel sell USSK within five years of signing the Memorandum of Understanding.
U. S. Steel has incurred and will continue to incur substantial capital, operating and maintenance and remediation expenditures as a result of environmental laws and regulations, which in recent years have been mainly for process changes in order to meet CAA obligations and similar obligations in Europe and Canada. In the future, compliance with carbon dioxide (CO2) emission requirements may include substantial costs for emission allowances, restriction of production and higher prices for coking coal, natural gas and electricity generated by carbon based systems. Since it is difficult to predict what requirements will ultimately be imposed in the United States, Canada and Europe, it is difficult to estimate the likely impact on U. S. Steel, but it could be substantial. To the extent these expenditures, as with all costs, are not ultimately reflected in the prices of U. S. Steel’s products and services, operating results will be reduced. U. S. Steel believes that our major North American and many European integrated steel competitors are confronted with substantially similar conditions and thus does not believe that its relative position with regard to such competitors will be materially affected by the impact of environmental laws and regulations. However, if the final requirements do not recognize the fact that the integrated steel process involves a series of chemical reactions involving carbon that create CO2 emissions, our competitive position relative to mini mills will be adversely impacted. Our competitive position compared to producers in developing nations, such as China and India, will be harmed unless such nations require commensurate reductions in CO2 emissions. Competing materials such as plastics may not be similarly impacted. The specific impact on each competitor may vary depending on a number of factors, including the age and location of its operating facilities and its production methods. U. S. Steel is also responsible for remediation costs related to former and present operating locations and disposal of environmentally sensitive materials. Many of our competitors, including North American producers, or their successors, that have been the subject of bankruptcy relief have no or substantially lower liabilities for such matters.
Greenhouse Gas Emissions Regulation
The current and potential regulation of greenhouse gas emissions remains a significant issue for the steel industry, particularly for integrated steel producers such as U. S. Steel. The regulation of greenhouse gases such as CO2 emissions has either become law or is being considered by legislative bodies of many nations, including countries where we have operating facilities. In the United States, the Environmental Protection Agency (EPA) has published rules for regulating greenhouse gas emissions for certain facilities and has implemented various reporting requirements as further described below.
In Utility Air Regulatory Group v. EPA, No. 11-1037 (consolidating various challenges); and Texas v. EPA, No. 10-1425, the U.S. Court of Appeals for the District of Columbia issued an opinion essentially upholding the EPA’s authority to regulate greenhouse gases. The court rejected challenges to the endangerment finding, giving the EPA authority to regulate greenhouse gases under the CAA on the basis that they pose a risk to human health. The court also rejected arguments by petitioners to dismiss inclusion of greenhouse emissions under the tailpipe rule, giving the EPA the authority to regulate greenhouse gas emissions from mobile sources and triggering regulation for stationary sources. The court dismissed challenges to the timing and tailoring rules citing that it lacked jurisdiction to decide the case on its merits since none of the petitioners had legal standing to challenge the timing and tailoring rules. Finally, the court declined to decide challenges to other State Implementation Plan (SIP) related rules issued by the EPA regarding greenhouse gases, stating that it also lacked jurisdiction over these SIP related rules. The rules are being challenged in different tribunals.
The EU has established greenhouse gas regulations for the EU member states, while in Canada, a regulatory framework for greenhouse gas emissions has been published, details of which are discussed below. International negotiations to supplement and eventually replace the 1997 Kyoto Protocol are ongoing.

-38-



Since 2009, the federal government has committed to reducing Canada’s total greenhouse gas emissions by 17 percent from 2005 levels by 2020. The Ontario government has committed to its own greenhouse gas emission reduction targets for the province. This plan announced greenhouse gas emission reduction targets of six percent below 1990 levels by 2014, 15 percent below 1990 levels by 2020 and 80 percent below 1990 levels by 2050. Both the federal and Ontario governments are currently seeking input from stakeholders, including industry, on the development of greenhouse gas emission reduction programs and, in addition, have expressed an intent to update limits on other emissions affecting air quality, with proposed implementation of the new limits beginning in 2015 through 2020.
If federal or provincial greenhouse gas reduction legislation for the steel sector becomes law in Canada, it could have economic and operational consequences for U. S. Steel. At the present time, it is not possible to estimate the timing or impact of these or other future government actions on U. S. Steel.
The EPA has classified greenhouse gases such as CO2 as harmful gases. Under this premise, it has implemented a greenhouse gas emission monitoring and reporting requirement for all facilities emitting 25,000 metric tons or more per year of carbon dioxide, methane and nitrous oxide in CO2 equivalent quantities. In accordance with EPA greenhouse gas emissions reporting requirements, reports for the year 2012 were completed and submitted for all required facilities by the April 1, 2013 deadline. As with previous year’s reporting, fourteen facilities submitted reports including Gary Works, East Chicago Tin, Midwest Plant, Clairton Plant, Edgar Thomson Plant, Irvin Plant, Fairless Plant, Fairfield Sheet, Fairfield Tubular, Granite City Works, Great Lakes Works, Lorain Tubular, Minntac and Keetac. The Texas Operations is the only significant operation not required to report as its emissions were well below the 25,000 ton reporting threshold.
New requirements were adopted in 2011 related to monitoring and reporting of greenhouse gas emissions for vacuum degassing (decarburization), and methane emissions from on-site landfills. Facilities for which greenhouse gas emissions from decarburization were determined and reported included Gary Works, Great Lakes Works, and the Edgar Thomson Plant. Calculation of landfill methane emissions from U. S. Steel facilities were completed earlier this year. New provisions for incorporating electronic reporting of on-site landfill methane emissions were added in 2012 enabling those subject to the rule to report greenhouse gas emissions from on-site landfills for 2011.
In 2013, the EPA significantly expanded its reporting requirements to include inputs to the calculations that had previously been deferred. This meant that in addition to the 2012 reports, the 2010 and 2011 reports also had to be re-submitted for many of our facilities. New requirements were also imposed for the monitoring and reporting of greenhouse gas emissions from industrial landfills, including reporting specific categories and historical quantities of materials sent to our on-site landfills.
As with previous year’s reports, the EPA intends to make this information publicly available from all facilities.
The European Commission (EC) has created an Emissions Trading System (ETS) and subsequent to 2012, the ETS will employ centralized allocation, rather than national allocation plans, that are expected to be more stringent than the previous requirements. The new ETS also includes a cap designed to achieve an overall reduction of greenhouse gases for the ETS sectors of 21 percent in 2020 compared to 2005 emissions and auctioning as the basic principle for allocating emissions allowances, with some transitional free allocation provided on the basis of benchmarks for manufacturing industries under risk of carbon leakage. Manufacturing of sinter, coke oven products, basic iron and steel, ferro-alloys and cast iron tubes have all been recognized as exposing companies to a significant risk of carbon leakage, but the new ETS is still expected to lead to additional costs for steel companies in Europe. Because the final scheme has not yet been published, we cannot reliably estimate the future market value of CO2 emission allowances and the cost of complying with the new ETS at this time.
Environmental Remediation
In the United States, U. S. Steel has been notified that we are a potentially responsible party (PRP) at 20 sites under CERCLA as of June 30, 2013. In addition, there are 9 sites related to U. S. Steel where we have received information requests or other indications that we may be a PRP under CERCLA but where sufficient information is not presently available to confirm the existence of liability or make any judgment as to the amount thereof. There are also 39 additional sites related to U. S. Steel where remediation is being sought under other environmental statutes, both federal and state, or where private parties are seeking remediation through discussions or litigation. At many of these sites, U. S. Steel is one of a number of parties involved and the total cost of remediation, as well as U. S. Steel’s share thereof, is frequently dependent upon the outcome of investigations and remedial studies. U. S. Steel accrues for environmental remediation activities when the responsibility to remediate is probable and the amount of associated costs is reasonably determinable. As environmental remediation matters proceed toward ultimate resolution or as

-39-



additional remediation obligations arise, charges in excess of those previously accrued may be required. See Note 20 to the Consolidated Financial Statements.
For discussion of relevant environmental items, see “Part II. Other Information—Item 1. Legal Proceedings—Environmental Proceedings.”
During the second quarter of 2013, U. S. Steel recorded a net decrease of $2 million to our accrual balance for environmental matters for U.S. and international facilities. The total accrual for such liabilities at June 30, 2013 was $201 million. These amounts exclude liabilities related to asset retirement obligations, disclosed in Note 15 to the Consolidated Financial Statements.
U. S. Steel is the subject of, or a party to, a number of pending or threatened legal actions, contingencies and commitments involving a variety of matters, including laws and regulations relating to the environment. The ultimate resolution of these contingencies could, individually or in the aggregate, be material to the financial statements. However, management believes that U. S. Steel will remain a viable and competitive enterprise even though it is possible these contingencies could be resolved unfavorably.
OUTLOOK
Results for our Flat-rolled and Tubular segments are projected to improve compared to the second quarter; however, we expect lower results from our European segment due to a planned blast furnace outage in the third quarter. Operating results for our Other Businesses are expected to decrease compared to the second quarter to near breakeven. Total reportable segment and Other Businesses results are expected to be comparable to the second quarter.
We expect our Flat-rolled segment results from operations to improve based on an increase in average realized prices, lower raw materials costs and lower repairs and maintenance costs partially offset by reduced shipments. Average realized prices are expected to increase compared to the second quarter due to increased spot market prices as well as a more favorable product mix. Shipments are projected to decrease significantly due to a blast furnace outage at our Great Lakes Works and the Lake Erie Works labor dispute. The represented employees at Lake Erie Works are scheduled to vote on the company’s contract offer on July 31, 2013. If the contract is approved, we plan to restart operations as soon as possible. This outlook does not include any effects of a restart of Lake Erie Works.
Third quarter results for our European segment are projected to decrease compared to the second quarter. A scheduled blast furnace outage will result in significantly lower shipments and increased facility repairs and maintenance costs. Average realized euro-based prices are expected to be lower compared to the second quarter as decreases in spot and contract market prices are partially offset by the positive effect of a higher percentage of value-added shipments. Raw materials costs are expected to be lower in the third quarter due primarily to lower iron costs.
We expect third quarter results for our Tubular segment to improve compared to the second quarter. Shipments are expected to increase to support anticipated drilling activity and average realized prices are projected to be comparable. Operating costs are expected to decrease due to operating efficiencies related to higher production volumes.
On July 1, 2013, U. S. Steel entered into a supplier contract dispute settlement agreement. As a result of the agreement, U. S. Steel expects to record a pre-tax gain of $23 million as an item not allocated to segments in the third quarter of 2013.
We expect a minimal tax provision/benefit in the third quarter primarily due to the full valuation allowance on deferred tax assets in Canada.

INTERNATIONAL TRADE
Demand for flat-rolled products is influenced by a wide variety of factors, including but not limited to macro-economic drivers, the supply-demand balance, inventories, imports and exports, currency fluctuations, and the demand from flat-rolled consuming markets. The largest drivers of North American consumption have historically been the automotive and construction markets, which make up more than 50 percent of total sheet consumption. Other sheet consuming industries include appliance, converter, container, tin, energy, electrical equipment, agricultural, domestic and commercial equipment and industrial machinery.
USSE conducts business primarily in Europe and like our domestic operations, USSE is affected by the cyclical nature of demand for steel products and the sensitivity of that demand to worldwide general economic conditions, sovereign

-40-



debt issues and the resulting economic uncertainties adversely affecting markets in the EU. We are subject to market conditions in those areas, which are influenced by many of the same factors that affect U.S. markets, as well as matters specific to international markets such as quotas, tariffs and other measures.
Demand for energy related tubular products depends on several factors, most notably the number of oil and natural gas wells being drilled, completed and re-worked, the depth and drilling conditions of these wells and the drilling techniques utilized. The level of these activities depends primarily on the demand for natural gas and oil and expectations about future prices for these commodities. Demand for our tubular products is also affected by the continuing development of shale oil and gas resources, the level of production by domestic manufacturers, inventories maintained by manufacturers, distributors, end users and by the level of new capacity and imports in the markets we serve.
In recent years, a significant number of steel imports have been found to violate U.S. or Canadian trade laws. Under these laws, antidumping (AD) duties can be imposed against dumped products, which are products sold at a price that is below that producer's sales price in its home market or at a price that is lower than its cost of production. Countervailing duties (CVD) can be imposed against products that have benefited from foreign government assistance for the production, manufacture, or exportation of the product. For many years, U. S. Steel, other producers, customers and the United Steel Workers have sought the imposition of duties and in many cases have been successful. Such duties are generally subject to review every five years and we actively participate in such review proceedings.
The following international trade orders of interest to U. S. Steel are currently undergoing five-year (sunset) reviews in the United States: (i) an AD order on welded large-diameter line pipe from Japan; (ii) an AD order on hot-rolled steel from China; (iii) AD and CVD orders on hot-rolled steel from India; (iv) AD and CVD orders on hot-rolled steel from Indonesia; (v) an AD order on hot-rolled steel from Taiwan; (vi) AD and CVD orders on hot-rolled steel from Thailand; (vii) an AD order on hot-rolled steel from Ukraine; and (viii) AD and CVD orders on circular welded pipe from China.
As in the past, U. S. Steel continues to monitor unfairly traded imports and is prepared to seek appropriate remedies against such importing countries. On July 2, 2013, U. S. Steel and eight other domestic producers filed AD and CVD petitions against imports of oil country tubular goods (OCTG) from India and Turkey, along with AD petitions against imports of OCTG from the Philippines, Saudi Arabia, South Korea, Taiwan, Thailand, Ukraine, and Vietnam. These petitions allege that unfairly-traded imports from the subject countries are both a cause and a threat of material injury to U.S. producers of OCTG. We estimate that litigation at the International Trade Commission (ITC) and the Department of Commerce should take roughly 13 months to complete. While U. S. Steel strongly believes that the imports in question were traded unfairly, and that relief is fully justified under U.S. law, the outcome of such litigation is uncertain. The ITC is scheduled to vote on a preliminary injury determination August 16, 2013.
Steel sheet imports to the United States accounted for an estimated 15 percent of the U.S. steel sheet market in 2012 and 13 percent of the U.S. steel sheet market in 2011 and 2010. Increases in future levels of imported steel could reduce future market prices and demand levels for steel produced in our North American facilities.
Imports of flat-rolled steel to Canada accounted for an estimated 34 percent of the Canadian market for flat-rolled steel products in 2012, 35 percent in 2011 and 40 percent in 2010.
Total imports of flat-rolled carbon steel products (excluding quarto plates and wide flats) to the 28 countries currently comprising the EU were 11 percent of the EU market in 2012, 17 percent of the EU market in 2011 and 14 percent in 2010. Increases in future levels of imported steel could reduce market prices and demand levels for steel produced by USSE.
Energy related tubular products imported into the United States accounted for an estimated 52 percent of the U.S. domestic market in 2012, 47 percent in 2011 and 46 percent in 2010. Increases in future levels of imported steel could reduce future market prices and demand levels for steel produced in our North American facilities.

We expect to continue to experience competition from imports and will continue to closely monitor imports of products in which we have an interest. Additional complaints may be filed if unfairly-traded imports adversely impact, or threaten to adversely impact, our financial results.
NEW ACCOUNTING STANDARDS
See Note 2 to the Consolidated Financial Statements in Part I Item 1 of this Form 10-Q.


-41-



Item 3.
QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
There were no material changes in U. S. Steel’s exposure to market risk from December 31, 2012.

-42-



Item 4.
CONTROLS AND PROCEDURES
EVALUATION OF DISCLOSURE CONTROLS AND PROCEDURES
U. S. Steel has evaluated the effectiveness of the design and operation of its disclosure controls and procedures as of June 30, 2013. These disclosure controls and procedures are the controls and other procedures that were designed to ensure that information required to be disclosed in reports that are filed with or submitted to the U.S. Securities and Exchange Commission is: (1) accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, to allow timely decisions regarding required disclosures and (2) recorded, processed, summarized and reported within the time periods specified in applicable law and regulations. Based on this evaluation, the Chief Executive Officer and Chief Financial Officer concluded that, as of June 30, 2013, U. S. Steel’s disclosure controls and procedures were effective.
CHANGES IN INTERNAL CONTROL OVER FINANCIAL REPORTING
There have not been any changes in U. S. Steel’s internal control over financial reporting that occurred during the fiscal quarter covered by this quarterly report, which have materially affected, or are reasonably likely to materially affect, U. S. Steel’s internal control over financial reporting.


-43-



UNITED STATES STEEL CORPORATION
SUPPLEMENTAL STATISTICS (Unaudited)
 
 
Three Months Ended June 30,
 
Six Months Ended June 30,
 
(Dollars in millions)
 
2013
 
2012
 
2013
 
2012
 
SEGMENT INCOME (LOSS) FROM OPERATIONS:
 
 
 
 
 
 
 
 
 
Flat-rolled
 
$
(51
)
 
$
177

 
$
(64
)
 
$
360

 
U. S. Steel Europe
 
10

 
34

 
48

 

(a) 
Tubular
 
45

 
103

 
109

 
232

 
Total reportable segments
 
4

 
314

 
93

 
592

 
Other Businesses
 
43

 
16

 
48

 
33

 
Items not allocated to segments
 
 
 
 
 
 
 
 
 
Postretirement benefit expense
 
(54
)
 
(77
)
 
(110
)
 
(154
)
 
Net loss on sale of assets
 

 

 

 
(310
)
 
Property tax settlements
 

 

 

 
19

 
Total income (loss) from operations
 
$
(7
)
 
$
253

 
$
31

 
$
180

 
CAPITAL EXPENDITURES
 
 
 
 
 
 
 
 
 
Flat-rolled
 
$
80

 
$
186

 
$
176

 
$
367

 
U. S. Steel Europe
 
8

 
7

 
18

 
9

 
Tubular
 
15

 
14

 
23

 
18

 
Other Businesses
 
2

 
1

 
4

 
3

 
Total
 
$
105

 
$
208

 
$
221

 
$
397

 
OPERATING STATISTICS
 
 
 
 
 
 
 
 
 
Average realized price: ($/net ton) (b)
 
 
 
 
 
 
 
 
 
     Flat-rolled
 
$
725

 
$
772

 
$
722

 
$
768

 
     U. S. Steel Europe
 
702

 
767

 
710

 
757

 
     USSK
 
702

 
767

 
710

 
761

 
     Tubular
 
1,510

 
1,706

 
1,532

 
1,717

 
Steel Shipments: (b)(c)
 
 
 
 
 
 
 
 
 
     Flat-rolled
 
3,728

 
3,986

 
7,746

 
8,078

 
     U. S. Steel Europe
 
1,062

 
955

 
2,110

 
2,000

 
     USSK
 
1,062

 
955

 
2,110

 
1,927

 
     Tubular
 
456

 
493

 
884

 
1,022

 
Raw Steel Production: (b)
 
 
 
 
 
 
 
 
 
     Flat-rolled
 
4,212

 
4,688

 
9,132

 
9,731

 
     U. S. Steel Europe
 
1,158

 
1,173

 
2,361

 
2,413

 
     USSK
 
1,158

 
1,173

 
2,361

 
2,325

 
Raw Steel Capability Utilization: (d)
 
 
 
 
 
 
 
 
 
     Flat-rolled
 
70
%
 
77
%
 
76
%
 
80
%
 
          Flat-rolled U.S. Facilities (e)
 
87
%
 
84
%
 
89
%
 
88
%
 
     U. S. Steel Europe
 
93
%
 
94
%
 
95
%
 
89
%
 
     USSK
 
93
%
 
94
%
 
95
%
 
93
%
 
(a) 
Includes income from operations for USSK of $17 million for the six months ended June 30, 2012.
(b) 
Excludes intersegment transfers.
(c) 
Thousands of net tons.
(d) 
Based on annual raw steel production capability of 24.3 million net tons for Flat-rolled and 5.0 million net tons for USSE. Prior to the sale of USSS on January 31, 2012, annual raw steel production capability for USSE was 7.4 million tons.
(e) 
AISI capability utilization rates include our U.S. facilities (Gary Works, Great Lakes Works, Mon Valley Works, Granite City Works and Fairfield Works).

-44-



PART II. OTHER INFORMATION
Item 1. LEGAL PROCEEDINGS
GENERAL LITIGATION
In a series of lawsuits filed in federal court in the Northern District of Illinois beginning September 12, 2008, individual direct or indirect buyers of steel products have asserted that eight steel manufacturers, including U. S. Steel, conspired in violation of antitrust laws to restrict the domestic production of raw steel and thereby to fix, raise, maintain or stabilize the price of steel products in the United States.  The cases are filed as class actions and claim treble damages for the period 2005 to present, but do not allege any damage amounts.  U. S. Steel will vigorously defend these lawsuits and does not believe that it is probable a liability regarding these matters has been incurred. We are unable to estimate a range of possible loss at this time.
ENVIRONMENTAL PROCEEDINGS
Gary Works
On March 4, 2010 the EPA notified U. S. Steel the requirements of the January 26, 1998 CWA consent decree in United States of America v. USX (Northern District of Indiana) had been satisfied. A joint motion to terminate the CWA consent decree was granted by the court on June 25, 2012, thereby terminating the consent decree in its entirety. As of June 30, 2013, project costs have amounted to $60.7 million. In 1998, U. S. Steel also entered into an additional consent decree with the public trustees, which resolves liability for natural resource damages on the same section of the Grand Calumet River. Work continues to complete and terminate the Natural Resource Damages order. U. S. Steel was obligated to perform, and has completed the ecological restoration in this section of the Grand Calumet River. Additionally, U. S. Steel has released the $1 million payment to the public trustee for ecological monitoring and received letters from the three trustees confirming completion of U. S. Steel's obligations. In total, the accrued liability for the above projects based on the estimated remaining costs was approximately $909,000 at June 30, 2013.
At Gary Works, U. S. Steel has agreed to close three hazardous waste disposal sites: D5, along with an adjacent solid waste disposal unit, Terminal Treatment Plant (TTP) Area; T2; and D2 combined with a portion of the Refuse Area, where a solid waste disposal unit overlaps with the hazardous waste disposal unit. The sites are located on plant property. The Indiana Department of Environmental Management (IDEM) has approved the closure plans for all three sites. U. S. Steel continues technical discussions with IDEM on the conditions of the D2 approval. Closure is complete at D5, TTP and T2, with IDEM approval of the closure certification reports on February 1, 2012 (D5), April 3, 2012 (TTP) and November 1, 2012 (T2). As of June 30, 2013, the accrued liability for estimated costs to close these sites is approximately $15 million.
On October 23, 1998, EPA issued a final Administrative Order on Consent (Order) addressing Corrective Action for Solid Waste Management Units (SWMU) throughout Gary Works. This Order requires U. S. Steel to perform a RCRA Facility Investigation (RFI), a Corrective Measure Study (CMS) and Corrective Measure Implementation at Gary Works. Reports of field investigation findings for Phase I work plans have been submitted to the EPA. Through June 30, 2013, U. S. Steel had spent $45.6 million for corrective action studies, Vessel Slip Turning Basin interim measures and other corrective actions. U. S. Steel has completed the second year of a facility wide perimeter groundwater monitoring program and has submitted an annual summary report to EPA recommending additional monitoring events to be conducted in 2013. U. S. Steel will also be undertaking additional localized focused groundwater assessment work recently approved by the EPA. U. S. Steel has also submitted and partially completed a Baseline Ecological Risk Assessment work plan for addressing sediments behind the East Breakwall. In addition, U. S. Steel has received approval from the EPA to proceed with an interim stabilization measure to address certain components of the East Side Groundwater Solid Waste Management Area as required by the Order. Until the remaining Phase I work and Phase II field investigations are completed, it is not possible to assess what additional expenditures will be necessary for Corrective Action projects at Gary Works. In total, the accrued liability for projects is approximately $43 million as of June 30, 2013, based on the estimated remaining costs.
Mon Valley Works
On March 17, 2008, U. S. Steel entered a Consent Order and Agreement (COA) with the Allegheny County Health Department (ACHD) to resolve alleged opacity limitation and pushing and traveling violations from older coke oven batteries at its Clairton Plant and to resolve alleged opacity violations from its Edgar Thomson Plant. Under the COA, U. S. Steel paid a civil penalty of $301,800 on March 25, 2008. The COA requires U. S. Steel to conduct interim repairs on existing batteries and make improvements at the Ladle Metallurgical Facility and Steelmaking Shop at the Edgar

-45-



Thomson Plant. The COA also required that Batteries 1, 2 and 3 be shutdown by August 11, 2015. On September 30, 2010, U. S. Steel and ACHD amended the COA to require U. S. Steel to install two new Low Emissions Quench Towers to replace existing towers and bring Batteries 1, 2 and 3 into compliance rather than shutting them down. We are repairing existing Batteries 19 and 20 and we continue to make improvements on Batteries 1, 2 and 3. Total costs for the quench towers are estimated to be approximately $68 million while the cost of improvements at Batteries 1, 2 and 3 cannot be estimated at this time. U. S. Steel is also completing upgrades at its Edgar Thomson Plant that would reduce emissions. U. S. Steel shut down Batteries 7, 8 and 9 in 2009 as required by the COA.

On October 8, 2009, Mon Valley Clairton Plant received a Notice of Violation (NOV) from ACHD alleging the Clairton Plant was culpable for hydrogen sulfide (H2S) Pennsylvania ambient air quality standard exceedances. The NOV requires U. S. Steel to submit a plan with milestones to reduce and minimize fugitive emissions of coke oven gas from the coke producing operations at Clairton including identification of coke oven gas emission sources and method of improved emission prevention and control. While U. S. Steel appealed the NOV on October 16, 2009, U. S. Steel submitted an Action Plan to ACHD that was required by the NOV. U. S. Steel and ACHD have performed H2S modeling, and evaluated all potential sources of H2S in the area. In light of the steps taken by U. S. Steel, and the inactivity of this matter by ACHD, disclosure of this matter in subsequent periods will no longer be made.
Midwest Plant
A former disposal area located on the east side of the Midwest Plant was designated a SWMU (East Side SWMU) by IDEM before U. S. Steel acquired this plant from National Steel Corporation. U. S. Steel submitted a Closure Plan to IDEM recommending consolidation and “in-place” closure of the East Side SWMU. IDEM approved the Closure Plan in January 2010. Implementation of the Closure Plan began during the third quarter of 2010 and fieldwork was completed early in the second quarter of 2011. A full vegetative cover over the project area is in place and the Closure Completion Report was approved by IDEM on November 21, 2011. As of June 30, 2013, $4.3 million has been spent on the project. The remaining cost is estimated to be $101,000 for post construction monitoring work and was recorded as an accrued liability as of June 30, 2013.
Fairless Plant
In January 1992, U. S. Steel commenced negotiations with the EPA regarding the terms of an Administrative Order on consent, pursuant to RCRA, under which U. S. Steel would perform an RFI and a CMS at our Fairless Plant. A Phase I RFI report was submitted during the third quarter of 1997. The cost to U. S. Steel to continue to maintain the interim measures, develop a Phase II/III RFI Work Plan and implement certain corrective measures is estimated to be $725,000. It is reasonably possible that additional costs of as much as $45 million to $75 million may be incurred at this site in combination with five other projects. See Note 20 to the Consolidated Financial Statements “Contingencies and Commitments – Environmental Matters – Remediation Projects – Projects with Ongoing Study and Scope Development.”
Fairfield Works
A consent decree was signed by U. S. Steel, the EPA and the U.S. Department of Justice (DOJ) and filed with the United States District Court for the Northern District of Alabama (United States of America v. USX Corporation) on December 11, 1997. In accordance with the consent decree, U. S. Steel initiated a RCRA corrective action program at the Fairfield Works facility. The Alabama Department of Environmental Management (ADEM) with the approval of the EPA assumed primary responsibility for regulation and oversight of the RCRA corrective action program at Fairfield Works. The Phase I RFI for waste disposed of at the Exum Materials Management Area was voluntarily implemented in October 2011, completed in December 2011 with the final completion report submitted to ADEM in June 2012. A Phase II RFI for the Fairfield Facility property was completed in December 2012 with the completion report to be submitted to ADEM during the third quarter of 2013. In total, the accrued liability for remaining work under the Corrective Action Program, including the former Ensley facility, was $337,000 at June 30, 2013, based on estimated remaining costs. It is reasonably possible that additional costs of as much as $45 million to $75 million may be incurred at this site in combination with five other projects. See Note 20 to the Consolidated Financial Statements “Contingencies and Commitments – Environmental Matters – Remediation Projects – Projects with Ongoing Study and Scope Development.”
Lorain Tubular Operations
In September 2006, U. S. Steel received a letter from the Ohio Environmental Protection Agency (OEPA) inviting U. S. Steel to enter into discussions about RCRA Corrective Action at Lorain Tubular Operations. A Phase I RFI on the identified SWMUs and Area of Contamination was submitted in March 2012 and a Phase II workplan that addresses

-46-



additional soil investigations, site wide groundwater and the pipe mill lagoon was submitted and approved by the OEPA. As of June 30, 2013, U. S. Steel has spent $831,000 on studies at this site. Costs to complete additional projects are estimated to be $409,000. It is reasonably possible that additional costs of as much as $45 million to $75 million may be incurred at this site in combination with five other projects. See Note 20 to the Consolidated Financial Statements “Contingencies and Commitments – Environmental Matters – Remediation Projects – Projects with Ongoing Study and Scope Development.”
Construction and start-up of a seep collection system at the D2 landfill was completed in the third and fourth quarters of 2011. The system was required by OEPA as part of a revised Post-Closure Care Plan for the landfill. Based on subsequent system influent and effluent water quality data, additional seep water treatment will be necessary to meet future permit limits. A permit to install was submitted to and approved by the OEPA during the fourth quarter of 2012 that permits installation of the new equipment. As of June 30, 2013, project costs have amounted to $1.5 million. The remaining cost of the project is expected to be $354,000 and was recorded as an accrued liability as of June 30, 2013.
Great Lakes Works
On February 13, 2007, Michigan Department of Environmental Quality (MDEQ) and U. S. Steel agreed to an Administrative Consent Order (the Order) that resolves alleged violations of CWA National Pollutant Discharge Elimination System permits at the Great Lakes Works facility. As required by the Order, U. S. Steel has paid a civil penalty of $300,000 and has reimbursed MDEQ $50,000 in costs. The Order identified certain compliance actions to address the alleged violations. U. S. Steel has completed work on most of these compliance actions, and has initiated work on the others. As of June 30, 2013, $1.8 million has been spent on the project. In addition, $161,000 remains accrued for possible additional requirements.
On April 20, 2011, U. S. Steel Great Lakes Works received an NOV from MDEQ regarding an alleged Basic Oxygen Process (BOP) roof monitor opacity violation that was to have occurred on April 14, 2011. On May 11, 2011, U. S. Steel responded to the NOV stating the alleged exceedance was caused by a desulfurization lance failure and that it has implemented corrective actions to prevent its recurrence. In light of the steps taken by U. S. Steel and the inactivity of this matter by MDEQ, disclosure of this matter in subsequent periods will no longer be made.

On May 10, 2011, the MDEQ issued a violation notice alleging that fallout from a bleeder incident on April 20, 2011 caused an unreasonable interference with the comfortable enjoyment of life and property in Windsor, Canada. U. S. Steel responded to the notice to MDEQ. In light of the steps taken by U. S. Steel and the inactivity of this matter by MDEQ, disclosure of this matter in subsequent periods will no longer be made.
On October 10, 2012, the MDEQ issued a violation notice alleging the No. 2 baghouse at the No. 2 BOP exceeded applicable emission limits based upon stack testing conducted earlier in 2012. On October 31, 2012, U. S. Steel responded to the notice indicating that corrective actions at the baghouse have been employed and stack tests conducted after the repairs were made to demonstrate the stack complies with emission limits. Discussions between U. S. Steel and MDEQ are on going pending a resolution of the matter.

On April 26, 2013, the MDEQ issued a violation notice alleging that the Selective Catalytic Reduction system on the Continuous Galvanizing Line was not operating properly on March 27, 2013. U. S. Steel responded to the violation notice on May 24, 2013. Discussions between U. S. Steel and MDEQ are ongoing pending a resolution of the matter.
Granite City Works
U. S. Steel received two NOVs, dated February 20, 2004 and March 25, 2004, for air violations at the coke batteries, the blast furnace and the steel shop at our Granite City Works facility. All of the issues have been resolved except for an issue relating to air emissions that occurs when coke is pushed out of the ovens, for which a compliance plan has been submitted to the Illinois Environmental Protection Agency (IEPA). On December 18, 2007, U. S. Steel and IEPA entered into a consent order (the Order) (State of Illinois ex. rel. Lisa Madigan vs. United States Steel Corporation), which resolved the issues raised in the two NOVs. The Order required that U. S. Steel: (1) pay a penalty of $300,000, which U. S. Steel paid on January 10, 2008; (2) demonstrate compliance with Coke Oven Pushing Operations in accordance with the compliance schedule provided in the Order; (3) comply with the basic oxygen furnace (BOF) opacity emissions in accordance with the schedule provided in the Order; and (4) submit to the IEPA a revised permit application with the correct sulfur dioxide emission factors. In February 2011, U. S. Steel demonstrated compliance with the applicable requirements and in March 2011, U. S. Steel certified compliance with the applicable regulations. U. S. Steel continues to negotiate permit modifications to address the blast furnace gas sulfur dioxide emission factor as required by the Order.

-47-



On July 1, 2010, U. S. Steel entered into a Memorandum of Understanding (MOU) with the IEPA that requires Granite City Works to achieve reductions in emissions of particulate matter. U. S. Steel will evaluate and install appropriate controls to achieve this purpose. To complete the obligations pursuant to the MOU, U. S. Steel anticipates incurring expenditures of approximately $55 million to install additional pollution controls at the BOF.
To comply with the Illinois State NOx RACT rule, U. S. Steel will install Flue Gas Recirculation and Continuous Emission Monitors on Boilers 11 and 12 at Granite City Works with expenditures of approximately $4 million. U. S. Steel evaluated and will install a NOx continuous emissions monitor for the slab reheat furnaces with expenditures of approximately $1 million.
On November 30, 2012, the IEPA issued a Violation Notice alleging violations of emission standards from the facility’s BOF. In the notice, the IEPA also alleged the facility failed to comply with associated CAA regulations and the facility did not use steam rings at the BOP as required by the facility’s Title V permit. U. S. Steel met with the IEPA on February 6, 2013 and provided a written response to the IEPA on February 27, 2013. To date, the IEPA has not responded to the U. S. Steel correspondence nor has any penalty been demanded.
Minnesota Ore Operations
On February 6, 2013, the EPA published a Federal Implementation Plan (FIP) that applies to taconite facilities in Minnesota. The FIP establishes and requires the use of low NOx burners on indurating furnaces as Best Available Retrofit Technology. While U. S. Steel has already installed low NOx burners on Minntac Lines 6 and 7 and is currently obligated to install low NOx burners on Lines 3, 4, and 5 pursuant to existing agreements and permits, the rule would require the installation of low NOx burners for the existing line at Keetac for which U. S. Steel did not have an otherwise existing obligation. U. S. Steel estimates the expenditures associated with the installation of low NOx burners as much as $20 million to $30 million. On June 14, 2013, the Eighth Circuit Court of Appeals stayed the effectiveness of the FIP.
On March 2, 2012, U. S. Steel’s Keetac facility received an NOV from the Minnesota Pollution Control Agency (MPCA) for alleged violations of the Minnesota Fugitive Dust Rule. U. S. Steel responded to the notice on March 30, 2012 in which it respectfully contested the allegations provided in the notice.
U. S. Steel and the MPCA reached agreement on a Schedule of Compliance (SOC) to reduce air emissions at the Minntac and Keetac facilities and to address alleged water quality issues at the Minntac facility. The SOC incorporates the Keetac Expansion Mercury Agreement associated with the MPCA’s Mercury Total Maximum Daily Load requirements and Minntac’s Title V NOx reduction requirements. A dry control system will be installed at the Minntac facility to reduce PM, PM10, PM2.5, SO2, and mercury emissions. Parts of the SOC became effective on June 9, 2011, while other parts became effective on October 19, 2011. U. S. Steel expects expenditures of approximately $220 million to install dry waste gas controls at Minntac.
On January 20, 2013, U. S. Steel’s Keetac facility received an Alleged Violations Letter (AVL) from MPCA alleging a violation of Minnesota rules during a wind and fugitive dust event on the Keetac Taconite tailings basin in December 2012. In February 2013, U. S. Steel responded to the AVL indicating that no violation occurred, and also explained the actions taken by Keetac during the December wind event to minimize emissions. To date, no response from the MPCA has been received nor has any penalty been assessed.
Geneva Works
At U. S. Steel’s former Geneva Works, liability for environmental remediation, including the closure of three hazardous waste impoundments and facility-wide corrective action, has been allocated between U. S. Steel and the current property owner pursuant to an agreement and a permit issued by the Utah Department of Environmental Quality. As of June 30, 2013, U. S. Steel has spent $17.9 million to complete remediation on certain areas of the site. Having completed the investigation on a majority of the remaining areas identified in the permit, U. S. Steel has determined the most effective means to address the remaining impacted material is to manage those materials in a previously approved on-site Corrective Action Management Unit. U. S. Steel has an accrued liability of $65 million as of June 30, 2013, for our estimated share of the remaining costs of remediation.
Duluth Works
The former U. S. Steel Duluth Works site was placed on the National Priorities List under CERCLA in 1983 and on the State of Minnesota’s Superfund list in 1984. Liability for environmental remediation at the site is governed by a Response Order by Consent executed with the MPCA in 1985 and a Record of Decision signed by MPCA in 1989.

-48-



As of June 30, 2013, U. S. Steel has spent $21.8 million to complete remediation on certain areas of the site. Current activity at the site is focused on completing the feasibility study and remedial design of the two St. Louis River Estuary Operable Units (OUs) along with completing a feasibility study on several Upland OUs, as defined during the latest 5-year review of the site, conducted by the MPCA in 2008. The remaining cost of the project is estimated to be $21 million and was recorded as an accrued liability as of June 30, 2013, but because several critical issues have yet to be resolved so that a preferred remedy may be selected, it is reasonably possible that additional costs of as much as $45 million to $75 million may be incurred at this site in combination with five other projects. See Note 20 to the Consolidated Financial Statements Contingencies and Commitments - Environmental Matters - Remediation Projects - Projects with Ongoing Study and Scope Development.
Municipal Industrial Disposal Company (MIDC)
MIDC was a licensed disposal facility where U. S. Steel disposed coal tar and other wastes. The site was mismanaged by the operator and subsequently on August 30, 2002, U. S. Steel entered into a COA with the Pennsylvania Department of Environmental Protection to address the environmental issues at the site. While U. S. Steel was not the only entity to use the facility, U. S. Steel is the single remaining viable company responsible for the cleanup. An engineered remedy for the three locations at the site requiring remediation was implemented in July 2011 and completed in December 2011. The final completion report was submitted to the agency in December 2012. As of June 30, 2013, U. S. Steel has spent $12 million related to the project. The remaining cost of the project is estimated to be $172,000 and was recorded as an accrued liability as of June 30, 2013.
USS-POSCO Industries (UPI)
At UPI, a joint venture between subsidiaries of U. S. Steel and POSCO, corrective measures have been implemented for the majority of the former SWMUs. Prior to the formation of UPI, U. S. Steel owned and operated the Pittsburg, California facility and retained responsibility for the existing environmental conditions. Seven SWMUs remain at the facility. Based on their constituents, six of these SWMUs have been combined into two groups of three, while one SWMU remains a single entity. Investigation of the single SWMU is complete and an engineered remedy is in development for submission to the Department of Toxic Substances Control (DTSC). Investigation for the second SWMU group is also complete with recommendations, limited to future monitoring only, currently being discussed with the California DTSC. Investigations continue for the remaining SWMU group and it is likely that corrective measures will be required, but it is not possible at this time to define a scope or estimate costs for what may be required by the DTSC. As of June 30, 2013, $903,000 remains for ongoing environmental studies and investigations. It is reasonably possible that additional costs of as much as $45 million to $75 million may be incurred at this site in combination with five other projects. See Note 20 to the Consolidated Financial Statements “Contingencies and Commitments – Environmental Matters – Remediation Projects – Projects with Ongoing Study and Scope Development.”
EPA Region V Federal Lawsuit
On August 1, 2012, the U.S. government, joined by the States of Illinois, Indiana and Michigan, filed a complaint in the Northern District of Indiana alleging various CAA and State air regulatory violations that were to have allegedly occurred at Gary Works, Granite City Works, and Great Lakes Works, our three integrated iron and steel facilities located in the EPA’s Region V. The Complaint alleges that Gary Works failed to obtain the proper pre-construction permit for a routine reline of its Blast Furnace No. 4 in 1990, and that the three facilities failed to meet certain operational, maintenance, opacity, and recordkeeping requirements under the CAA and its implementing regulations. The Complaint requests relief in the form of statutory penalties for each violation and for injunctive relief. U. S. Steel believes that the claims asserted in the Complaint are not justified and are without statutory foundation. On September 21, 2012, U. S. Steel filed a motion to dismiss the U.S. government’s claims for relief regarding the 1990 reline of the Gary Blast Furnace No. 4 and filed an answer to the remaining allegations in the Complaint. On January 24, 2013, the Court heard oral arguments regarding the motion to dismiss. The motion is still pending before the Court. U. S. Steel will continue to vigorously defend against these claims. At this time, the potential outcome is not reasonably estimable.
Other
In April 2003, U. S. Steel and Salomon Smith Barney Holdings, Inc. (SSB) entered into a consent order with the Kansas Department of Health & Environment (KDHE) concerning a former zinc smelting operation in Cherryvale, Kansas. Remediation was essentially completed in 2007 and U. S. Steel and SSB continue to work with KDHE to address the remaining issues. As such, the Consent Order was amended on May 3, 2013, to investigate potential contamination beyond the boundary of the former zinc smelting operation. As of June 30, 2013, an accrual of $236,000 remains available for addressing these outstanding issues.

-49-



On January 18, 2011, KDHE signed a Consent Agreement and Final Order (CAFO), which obligates U. S. Steel to prepare and implement a corrective action plan for two sites in Girard, Kansas. The sites are referred to as the Girard Zinc Works and the Cherokee Lanyon #2 site. The CAFO recognizes a single project incorporating the corrective action for both sites. An addendum to the May 2012 Final Corrective Action Completion Report summarizing completion of fieldwork was submitted to KDHE on March 18, 2013 and subsequently approved by KDHE on March 22, 2013. U. S. Steel is currently working with KDHE in developing a long term care agreement to address post closure items for the site. As of June 30, 2013, U. S. Steel has an accrued liability of approximately $70,000.
In January of 2004, U. S. Steel received notice of a claim from the Texas Commission on Environmental Quality (TCEQ) and notice of claims from citizens of a cap failure at the Dayton Landfill. U. S. Steel’s allocated share is approximately 16 percent. The Remedial Action Plan for the site was approved by TCEQ in June 2009. Implementation of remedial measures was initiated in July 2010 and all fieldwork was completed in November 2011. On March 18, 2013, TCEQ approved the Response Action Completion Report. The accrued liability for U. S. Steel’s share to implement the post-closure monitoring program was $774,000 as of June 30, 2013.
In May 2010, MPCA notified Canadian National Railroad Company (CN) of apparent environmental impacts on their property adjacent to the former U. S. Steel Duluth Works. U. S. Steel subsequently obtained information indicating U. S. Steel’s connection to the site as well as reviewed a site investigation report that CN prepared and submitted to MPCA in August 2011. On December 6, 2011, U. S. Steel agreed to purchase the site and to take responsibility for addressing the identified environmental impacts. The property transaction was closed on June 26, 2012. As of June 30, 2013, U. S. Steel has an accrued liability of approximately $2 million.
The Canadian and Ontario governments have identified for remediation a sediment deposit, commonly referred to as Randle Reef, in Hamilton Harbor near USSC’s Hamilton Works, for which the regulatory agencies estimate expenditures with a net present value of approximately C$120 million (approximately $114 million). The national and provincial governments have each allocated C$40 million (approximately $38 million) for this project. Local sources, including industry, have also agreed to provide funding of C$40 million (approximately $38 million) for the project. USSC has committed to contribute approximately 11,000 tons of hot rolled steel and to fund C$2 million (approximately $2 million). The steel contribution is expected to be made in 2014. As of June 30, 2013,U. S. Steel has an accrued liability of approximately $10 million reflecting the contribution commitment.
U. S. Steel is identified as a PRP at the former Breslube-Penn operating site, an oil recycling and solvent recovery operation located in Coraopolis, PA. U. S. Steel’s allocated share of the cost among the participating PRPs is approximately 29 percent. A Record of Decision was issued by the EPA in August 2007 and a Remedial Design was preliminarily approved in 2011 and is still under review by the agencies. As of June 30, 2013, U. S. Steel has an accrued liability of approximately $2 million reflecting U. S. Steel’s share of the cost to implement remedial measures at the site.
ASBESTOS LITIGATION
At June 30, 2013, U. S. Steel was a defendant in approximately 805 active cases involving approximately 3,345 plaintiffs. As of December 31, 2012, U. S. Steel was a defendant in approximately 790 active cases involving approximately 3,330 plaintiffs. For the period ended June 30, 2013, settlements and dismissals resulted in the disposition of approximately 110 claims and U. S. Steel paid approximately $5 million in settlements. New filings added approximately 125 claims.
About 2,560, or approximately 77 percent, of these claims are currently pending in jurisdictions which permit filings with massive numbers of plaintiffs. Based upon U. S. Steel’s experience in such cases, it believes the actual number of plaintiffs who ultimately assert claims against U. S. Steel will likely be a small fraction of the total number of plaintiffs. Most of the claims filed in recent years involve individual or small groups of claimants.
Historically, these claims against U. S. Steel fall into three major groups: (1) claims made by persons who allegedly were exposed to asbestos at U. S. Steel facilities (referred to as “premises claims”); (2) claims made by industrial workers allegedly exposed to products formerly manufactured by U. S. Steel; and (3) claims made under certain federal and general maritime laws by employees of former operations of U. S. Steel. The ultimate outcome of any claim depends upon a myriad of legal and factual issues, including whether the plaintiff can prove actual disease, if any; actual exposure, if any, to U. S. Steel products; the duration of exposure to asbestos, if any, on U. S. Steel’s premises and the plaintiff’s exposure to other sources of asbestos. In general, the only insurance available to U. S. Steel with respect to asbestos claims is excess casualty insurance, which has multi-million dollar self-insured retentions. To date, U. S. Steel has received minimal payments under these policies relating to asbestos claims.

-50-



These asbestos cases allege a variety of respiratory and other diseases based on alleged exposure to asbestos. U. S. Steel is currently a defendant in cases in which a total of approximately 260 plaintiffs allege that they are suffering from mesothelioma. The potential for damages against defendants may be greater in cases in which the plaintiffs can prove mesothelioma.
In many cases in which claims have been asserted against U. S. Steel, the plaintiffs have been unable to establish any causal relationship to U. S. Steel or our products or premises; however, with the decline in mass plaintiff cases, the incidence of claimants actually alleging a claim against U. S. Steel is increasing. In addition, in many asbestos cases, the plaintiffs have been unable to demonstrate they have suffered any identifiable injury or compensable loss at all; that any injuries they have incurred did in fact result from alleged exposure to asbestos; or that such alleged exposure was in any way related to U. S. Steel or our products or premises.
In every asbestos case in which U. S. Steel is named as a party, the complaints are filed against numerous named defendants and generally do not contain allegations regarding specific monetary damages sought. To the extent that any specific amount of damages is sought, the amount applies to claims against all named defendants and in no case is there any allegation of monetary damages against U. S. Steel. Historically, approximately 89 percent of the cases against U. S. Steel did not specify any damage amount or stated that the damages sought exceeded the amount required to establish jurisdiction of the court in which the case was filed. (Jurisdictional amounts generally range from $25,000 to $75,000). U. S. Steel does not consider the amount of damages alleged, if any, in a complaint to be relevant in assessing our potential exposure to asbestos liabilities.
U. S. Steel aggressively pursues grounds for the dismissal of U. S. Steel from pending cases and litigates cases to verdict where we believe litigation is appropriate. U. S. Steel also makes efforts to settle appropriate cases, especially mesothelioma cases, for reasonable, and frequently nominal, amounts.
The following table shows activity with respect to asbestos litigation:
Period ended
 
Opening
Number
of Claims
 
Claims
Dismissed,
Settled
and Resolved
 
New
Claims
 
Closing
Number
of Claims
 
Amounts
Paid to
Resolve
Claims
(in millions)
December 31, 2010
 
3,040
 
200
 
250
 
3,090
 
$8
December 31, 2011
 
3,090
 
130
 
275
 
3,235
 
$8
December 31, 2012
 
3,235
 
190
 
285
 
3,330
 
$15
June 30, 2013
 
3,330
 
110
 
125
 
3,345
 
$5
The amount U. S. Steel has accrued for pending asbestos claims is not material to U. S. Steel’s financial position. U. S. Steel does not accrue for unasserted asbestos claims because it is not possible to determine whether any loss is probable with respect to such claims or even to estimate the amount or range of any possible losses. The vast majority of pending claims against us allege so-called “premises” liability-based exposure on U. S. Steel’s current or former premises. These claims may be made by an indeterminable number of people such as truck drivers, railroad workers, salespersons, contractors and their employees, government inspectors, customers, visitors and even trespassers. In most cases, the claimant also was exposed to asbestos in non-U. S. Steel settings; the relative periods of exposure between U. S. Steel and non-U. S. Steel settings vary with each claimant, and the strength or weakness of the causal link between U. S. Steel exposure and any injury vary widely as do the nature and severity of the injury claimed.
We are unable to estimate the ultimate outcome of asbestos-related lawsuits, claims and proceedings due to the unpredictable nature of personal injury litigation. Despite this uncertainty, management believes that the ultimate resolution of these matters will not have a material adverse effect on the Company’s financial condition, although the resolution of such matters could significantly impact results of operations for a particular period. Among the factors considered in reaching this conclusion are: (1) it has been many years since U. S. Steel employed maritime workers or manufactured or sold asbestos containing products; (2) most asbestos containing material was removed or remediated at U. S. Steel facilities many years ago and (3) U. S. Steel’s history of trial outcomes, settlements and dismissals.
The foregoing statements of belief are forward-looking statements. Predictions as to the outcome of pending litigation are subject to substantial uncertainties with respect to (among other things) factual and judicial determinations, and actual results could differ materially from those expressed in these forward-looking statements.

-51-



Item 4.
MINE SAFETY DISCLOSURES
The information concerning mine safety violations and other regulatory matters required by Section 150 of the Dodd-Frank Wall Street Reform Act (the Act) and Item 104 of Regulation S-K is included in Exhibit 95 to this Form 10-Q.

-52-



Item 6.
EXHIBITS
10.1
 
Administrative Regulations for the Long-Term Incentive Compensation Program under the United States Steel Corporation 2005 Stock Incentive Plan, as Amended and Restated, effective May 28, 2013. Incorporated by reference to Exhibit 10.1 to Form 8-K filed on May 30, 2013.
 
 
 
31.1
 
Certification of Chief Executive Officer required by Rules 13a-14(a) or 15d-14(a) of the Securities Exchange Act of 1934, as promulgated by the Securities and Exchange Commission pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.
 
 
31.2
 
Certification of Chief Financial Officer required by Rules 13a-14(a) or 15d-14(a) of the Securities Exchange Act of 1934, as promulgated by the Securities and Exchange Commission pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.
 
 
32.1
 
Certification of Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.
 
 
32.2
 
Certification of Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.
 
 
95
 
Mine Safety Disclosure required under Section 1503 of the Dodd-Frank Wall Street Reform and Consumer Protection Act.
 
 
101 INS
 
XBRL Instance Document
 
 
101 SCH
 
XBRL Taxonomy Extension Schema Document
 
 
101 CAL
 
XBRL Taxonomy Extension Calculation Linkbase Document
 
 
101 DEF
 
XBRL Taxonomy Extension Definition Linkbase Document
 
 
101 LAB
 
XBRL Taxonomy Extension Label Linkbase Document
 
 
101 PRE
 
XBRL Taxonomy Extension Presentation Linkbase Document



-53-



SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned chief accounting officer thereunto duly authorized.
UNITED STATES STEEL CORPORATION
 
 
By
 
/s/ Gregory A. Zovko
 
 
 
 
Gregory A. Zovko
 
 
Vice President and Controller
July 30, 2013
WEB SITE POSTING
This Form 10-Q will be posted on the U. S. Steel web site, www.ussteel.com, within a few days of its filing.